Note
Action
Place the new support shaft with bearing in place.
3
xx1500001686
Align the bolt pattern.
4
Tightening torque: 24 Nm.
Pull down the screws alternately until the shaft is
seated.
5
xx1500001691
Apply rust protection Mercasol on the support
shaft and bearing.
6
Reconnect cabling.
7
Refit cover to axis 6 motor.
8
xx1500001685
Refit cover with gasket to wrist unit. Use M6x20
in hole closest to robot axis-6.
Note
Reconnect the "over pressure" air hose to axis 6
motor before tightening the cover.
Note
Replace gasket if damaged.
9
272
Product manual - IRB 6640 Foundry Prime
3HAC040586-001 Revision: N
© Copyright 2011-2018 ABB. All rights reserved.
4 Repair
4.4.3 Replacement of support shaft with bearing axis 5
Continued
Содержание IRB 6640 Foundry Prime
Страница 1: ...ROBOTICS Product manual IRB 6640 Foundry Prime ...
Страница 2: ...Trace back information Workspace R18 1 version a9 Checked in 2018 03 22 Skribenta version 5 2 025 ...
Страница 18: ...This page is intentionally left blank ...
Страница 118: ...This page is intentionally left blank ...
Страница 438: ...This page is intentionally left blank ...
Страница 448: ...This page is intentionally left blank ...
Страница 456: ...This page is intentionally left blank ...
Страница 486: ...This page is intentionally left blank ...
Страница 488: ...This page is intentionally left blank ...
Страница 495: ......