
Note
Action
Remove the SMB unit as detailed in
3
Refit the new SMB unit according to step 3 - 6 in
Refitting, SMB unit on page 290
4
Note
Make sure that the gasket under the SMB cover is
not damaged!
Secure the SMB cover with its attachment screws.
5
Apply rust preventive on the surface around the
SMB cover and under/on top of the screw heads.
6
Perform a leakdown test according to
air hoses (Foundry Prime) on page 155
.
7
See
Update the revolution counter.
8
DANGER
Make sure all safety requirements are met when
performing the first test run. These are further de-
tailed in the section
First test run may cause injury
9
292
Product manual - IRB 6640 Foundry Prime
3HAC040586-001 Revision: N
© Copyright 2011-2018 ABB. All rights reserved.
4 Repair
4.5.1 Replacing the SMB unit
Continued
Содержание IRB 6640 Foundry Prime
Страница 1: ...ROBOTICS Product manual IRB 6640 Foundry Prime ...
Страница 2: ...Trace back information Workspace R18 1 version a9 Checked in 2018 03 22 Skribenta version 5 2 025 ...
Страница 18: ...This page is intentionally left blank ...
Страница 118: ...This page is intentionally left blank ...
Страница 438: ...This page is intentionally left blank ...
Страница 448: ...This page is intentionally left blank ...
Страница 456: ...This page is intentionally left blank ...
Страница 486: ...This page is intentionally left blank ...
Страница 488: ...This page is intentionally left blank ...
Страница 495: ......