Refitting, battery
Use this procedure to refit the SMB battery.
Note
Action
DANGER
Turn off all:
•
electric power supply
•
hydraulic pressure supply
to the robot, before entering the robot working
area.
1
ELECTROSTATIC DISCHARGE (ESD)
The unit is sensitive to ESD. Before handling the
unit please read the safety information in the sec-
tion
The unit is sensitive to ESD on page 34
2
Clean the joints that have been opened. See
the paint or surface on the robot before replacing
parts on page 219
3
Art. no. is specified in
Reconnect the
battery cable
and install the battery
pack into the SMB/battery recess.
Note
RMU batteries are installed together with a battery
holder to be properly secured inside the recess.
See figure.
4
Shown in figure
.
A
B
D
C
xx1300000307
A Battery pack RMU
B Battery holder
C Battery cable
D Strap
Strap the battery cable to the holder.
Shown in figure
.
Secure the
SMB battery cover
with its attachment
screws.
5
Seal and paint the joints that have been opened.
See
Cut the paint or surface on the robot before
6
Detailed in chapter Calibration -
section
Update the revolution counters.
7
Continues on next page
Product manual - IRB 6640 Foundry Prime
191
3HAC040586-001 Revision: N
© Copyright 2011-2018 ABB. All rights reserved.
3 Maintenance
3.4.8 Replacing the SMB battery
Continued
Содержание IRB 6640 Foundry Prime
Страница 1: ...ROBOTICS Product manual IRB 6640 Foundry Prime ...
Страница 2: ...Trace back information Workspace R18 1 version a9 Checked in 2018 03 22 Skribenta version 5 2 025 ...
Страница 18: ...This page is intentionally left blank ...
Страница 118: ...This page is intentionally left blank ...
Страница 438: ...This page is intentionally left blank ...
Страница 448: ...This page is intentionally left blank ...
Страница 456: ...This page is intentionally left blank ...
Страница 486: ...This page is intentionally left blank ...
Страница 488: ...This page is intentionally left blank ...
Страница 495: ......