Preparation of the frame before refitting gearbox axis 1
Use this procedure for the preparation of the frame before refitting the gearbox
axis 1.
Note
Action
xx1000000335
Remove residues of old sealing (Sikaflex)
located between the gearbox unit and the
frame as shown in the figure.
1
Apply grease on the
surface between gear-
box unit and frame (A)
.
2
Clean the
guidance edges
and the
joint
surface
carefully.
3
•
A: Surface between gearbox unit
and frame
•
B: Guidance edge
•
C: Joint surface
Preparation of the base before refitting gearbox axis 1
Use this procedure for preparation of the base before refitting the gearbox axis 1.
Note
Action
xx1000000336
Clean the
joint surface
on the base carefully
and check that the corresponding surface
on the frame also is clean.
1
•
A: Guidance edge
•
B: Joint surface
•
C: Mercasol
Clean the
painted surface
outside the guid-
ance edge.
2
See the figure above.
Remove old corrosion coating from the
guidance edge carefully.
3
See the figure above.
Apply
Mercasol
on the surface outside the
guidance edge.
Note
Make sure there is no Mercasol on the joint
surface.
4
Continues on next page
Product manual - IRB 6640 Foundry Prime
393
3HAC040586-001 Revision: N
© Copyright 2011-2018 ABB. All rights reserved.
4 Repair
4.7.1 Replacing gearbox axis 1
Continued
Содержание IRB 6640 Foundry Prime
Страница 1: ...ROBOTICS Product manual IRB 6640 Foundry Prime ...
Страница 2: ...Trace back information Workspace R18 1 version a9 Checked in 2018 03 22 Skribenta version 5 2 025 ...
Страница 18: ...This page is intentionally left blank ...
Страница 118: ...This page is intentionally left blank ...
Страница 438: ...This page is intentionally left blank ...
Страница 448: ...This page is intentionally left blank ...
Страница 456: ...This page is intentionally left blank ...
Страница 486: ...This page is intentionally left blank ...
Страница 488: ...This page is intentionally left blank ...
Страница 495: ......