![ABB IRB 390 Скачать руководство пользователя страница 283](http://html.mh-extra.com/html/abb/irb-390/irb-390_product-manual_5047283.webp)
Note
Article number
Equipment
Always use guide pins in pairs.
-
Guide pin, M6x150
Used to rotate the motor pinion.
3HAB7887-1
Rotation tool
Delivered as a set of calibration
tools.
3HAC055412-001
Calibration toolbox, Axis Calibra-
tion
Content is defined in section
.
-
Standard toolkit
Removing the gear unit pre-stage
Use these procedures to remove the axis-5 gear unit pre-stage.
Preparations before removing the axis-5 gear unit pre-stage
Note
Action
This is done to facilitate updating
of the revolution counter.
Jog the robot to calibration position.
1
DANGER
Turn off all:
•
electric power supply
•
hydraulic pressure supply
•
air pressure supply
to the robot, before entering the safeguarded
space.
2
Removing the top cover
Note
Action
xx2000001006
Disconnect connector R1.MP from the base.
1
CAUTION
Clean cover from metal residues before opening.
Metal residues can cause shortage on the boards
which can result in hazardous failures.
2
Continues on next page
Product manual - IRB 390
283
3HAC066566-001 Revision: B
© Copyright 2020 - 2021 ABB. All rights reserved.
5 Repair
5.6.5 Replacing the axis-5 gear unit pre-stage
Continued
Содержание IRB 390
Страница 1: ...ROBOTICS Product manual IRB 390 ...
Страница 2: ...Trace back information Workspace 21A version a11 Checked in 2021 03 19 Skribenta version 5 4 005 ...
Страница 8: ...This page is intentionally left blank ...
Страница 14: ...This page is intentionally left blank ...
Страница 36: ...This page is intentionally left blank ...
Страница 44: ...This page is intentionally left blank ...
Страница 118: ...This page is intentionally left blank ...
Страница 330: ...This page is intentionally left blank ...
Страница 344: ......
Страница 345: ......