
Note
Action
Tightening torque: 1.4 Nm (for CRB
15000-5/0.95) / 1.9 Nm (for CRB
15000-10/1.52 and CRB 15000-
12/1.27)
Torque tighten all screws crosswise.
8
xx2000002090
Remove the lifting aid by removing the screws.
9
Clean pushed-out flange sealant, if any.
10
Connecting the axis-4 joint unit cabling
Note
Action
xx2000002088
Reconnect the connectors to the drive board.
•
D4/5.X1 to X1
•
D4/5.X4 to X4
•
D4/5.X5 to X5
1
Refitting the tilt
Note
Action
Guide pin, M3x110: 3HAC077787-
001
Fit two guide pins to the axis-5 joint.
1
Always use guide pins in pairs.
xx2000002146
Continues on next page
582
Product manual - CRB 15000
3HAC077389-001 Revision: L
© Copyright 2021 - 2023 ABB. All rights reserved.
5 Repair
5.4.3 Replacing the tubular
Continued
Содержание CRB 15000
Страница 1: ...ROBOTICS Product manual CRB 15000 ...
Страница 2: ...Trace back information Workspace 23B version a17 Checked in 2023 06 29 Skribenta version 5 5 019 ...
Страница 8: ...This page is intentionally left blank ...
Страница 16: ...This page is intentionally left blank ...
Страница 38: ...This page is intentionally left blank ...
Страница 54: ...This page is intentionally left blank ...
Страница 182: ...This page is intentionally left blank ...
Страница 200: ...This page is intentionally left blank ...
Страница 1058: ...This page is intentionally left blank ...
Страница 1076: ...This page is intentionally left blank ...
Страница 1095: ......