Separating the cable package from the swing
Note
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
1
xx1800002499
Remove the cable bracket.
2
Disconnecting the air hoses, CP/CS cabling and Ethernet cabling (if equipped)
Note
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
1
xx1800002500
Disconnect the air hoses from the Y-shaped con-
nectors.
2
Continues on next page
198
Product manual - CRB 1100
3HAC078007-001 Revision: J
© Copyright 2021-2023 ABB. All rights reserved.
5 Repair
5.3.1 Replacing the upper cable package
Continued
Содержание CRB 1100
Страница 1: ...ROBOTICS Product manual CRB 1100 ...
Страница 2: ...Trace back information Workspace 23B version a17 Checked in 2023 06 29 Skribenta version 5 5 019 ...
Страница 162: ...This page is intentionally left blank ...
Страница 184: ...This page is intentionally left blank ...
Страница 652: ...This page is intentionally left blank ...
Страница 698: ...This page is intentionally left blank ...
Страница 712: ...This page is intentionally left blank ...
Страница 714: ...This page is intentionally left blank ...
Страница 719: ......