Loosening the cable package from axis-1 gearbox
Note
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
1
xx1800003032
Access the cable package locking screw on the
axis-1 gearbox from the swing and then loosen
the locking screw.
2
Remove the locking screw.
3
Disconnecting the connectors at the division point
Note
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
1
xx1800002497
Disconnect the connectors.
•
J2.FB3,4,5,6
•
J2.MP3,4,5/6
Tip
Take photos of the connector and cable position
before disconnecting them, to have as a reference
when reconnecting.
2
Continues on next page
Product manual - CRB 1100
241
3HAC078007-001 Revision: J
© Copyright 2021-2023 ABB. All rights reserved.
5 Repair
5.3.2 Replacing the lower cable package
Continued
Содержание CRB 1100
Страница 1: ...ROBOTICS Product manual CRB 1100 ...
Страница 2: ...Trace back information Workspace 23B version a17 Checked in 2023 06 29 Skribenta version 5 5 019 ...
Страница 162: ...This page is intentionally left blank ...
Страница 184: ...This page is intentionally left blank ...
Страница 652: ...This page is intentionally left blank ...
Страница 698: ...This page is intentionally left blank ...
Страница 712: ...This page is intentionally left blank ...
Страница 714: ...This page is intentionally left blank ...
Страница 719: ......