Start-up 63
8
Start-up
Contents of this chapter
This chapter describes the start-up procedure of the converter unit. The information is
valid for cabinet-installed ACS880-1607 DC/DC converter units.
The underlined tasks are needed for certain cases only. The option codes (if any) are
given in brackets. The default device designations (if any) are given in square brackets.
For example: DC/DC converter with the DC switch/disconnector ([Q11], F286).
The same device designations are also used in the circuit diagrams, typically.
These instructions do not cover all possible start-up tasks of a customized drive and
energy storage media. Always refer to the delivery-specific circuit diagrams when
proceeding with the start-up.
WARNING!
Only qualified by ABB electricians/engineers are allowed to do the
work described in this chapter. In addition, the electrician/engineer must know the
energy storage system he is about to take in use, and the DC/DC converter
control program and operation principle. Obey all safety instructions in
Safety instructions
for ACS880 multidrive cabinets and modules
(3AUA0000102301 [English] and
on page
. If you ignore the safety instructions, injury or death, or
damage to the equipment can occur.
Содержание ACS880-1607
Страница 1: ...ABB industrial drives Hardware manual ACS880 1607 DC DC converter units ...
Страница 4: ......
Страница 12: ...12 Introduction to the manual ...
Страница 34: ...34 Mechanical installation ...
Страница 40: ...40 Guidelines for planning electrical installation ...
Страница 52: ...52 Electrical installation ...
Страница 68: ...68 Start up ...
Страница 80: ...80 Maintenance 7 3 4 5 6 ...
Страница 82: ...82 Maintenance 3 4 5 6 7 8 9 9 ...
Страница 85: ...Maintenance 85 12 Install and tighten the two screws 10 11 12 ...
Страница 92: ...92 Maintenance 3 6 4 5 4 7a 7b 7b ...
Страница 93: ...Maintenance 93 9 8 8 10 11 ...
Страница 96: ...96 Maintenance 4 8 6 7 5 3 ...
Страница 97: ...Maintenance 97 9 ...
Страница 118: ...118 Dimensions Dimension drawings Frame 1 R8i bottom cable entry ...
Страница 119: ...Dimensions 119 Frame 1 R8i top cable entry ...
Страница 120: ...120 Dimensions Location and size of input terminals Frame 1 R8i bottom cable entry Frame 1 R8i top cable entry ...
Страница 122: ...www abb com drives www abb com drivespartners 3AXD50000023644 Rev B EN 2017 01 30 Contact us ...