Wiring
For the electrical specifications of the STO connection, see the technical data of the
control unit.
■
Activation switch
In the wiring diagrams, the activation switch has the designation [K]. This represents a
component such as a manually operated switch, an emergency stop push button switch,
or the contacts of a safety relay or safety PLC.
• In case a manually operated activation switch is used, the switch must be of a type
that can be locked out to the open position.
• The contacts of the switch or relay must open/close within 200 ms of each other.
• An FSO-xx safety functions module or an FPTC-0x thermistor protection module
can also be used. For more information, see the module documentation.
■
Cable types and lengths
• Double-shielded twisted-pair cable is recommended.
• Maximum cable lengths:
• 300 m (1000 ft) between activation switch [K] and drive control unit
• 60 m (200 ft) between multiple drives
• 60 m (200 ft) between external power supply and first control unit
Note:
A short-circuit in the wiring between the switch and an STO terminal causes a
dangerous fault. Therefore, it is recommended to use a safety relay (including wiring
diagnostics) or a wiring method (shield grounding, channel separation) which reduces
or eliminates the risk caused by the short-circuit.
Note:
The voltage at the STO input terminals of the control unit must be at least 17 V DC
to be interpreted as “1”.
The pulse tolerance of the input channels is 1 ms.
■
Grounding of protective shields
• Ground the shield in the cabling between the activation switch and the control unit
at the control unit only.
• Ground the shield in the cabling between two control units at one control unit only.
The Safe torque off function 211
Содержание ACS880-11
Страница 1: ... ABB INDUSTRIAL DRIVES ACS880 11 drives Hardware manual ...
Страница 2: ......
Страница 4: ......
Страница 26: ...26 ...
Страница 52: ...52 ...
Страница 82: ...82 ...
Страница 95: ...R6 R8 IP21 R6 R8 IP55 Electrical installation IEC 95 ...
Страница 103: ...R6 1 5 N m 0 5 N m Electrical installation IEC 103 ...
Страница 104: ...R8 1 5 N m 0 5 0 6 N m 104 Electrical installation IEC ...
Страница 112: ...With FDPI 02 modules OPEN TERMIN ATED 1 1 2 2 OPEN TERMINATED 3 112 Electrical installation IEC ...
Страница 116: ...R6 R8 UL Type 1 R6 R8 UL Type 12 116 Electrical installation North America NEC ...
Страница 120: ...R3 7 7 8 8 L1 L2 L3 T1 U T2 V T3 W PE Ground 1 7 N m 1 2 lbf ft 120 Electrical installation North America NEC ...
Страница 142: ...142 ...
Страница 154: ... Fan arrow must point up 154 Maintenance ...
Страница 160: ...160 ...
Страница 181: ... Package dimensions R6 R3 R8 Technical data 181 ...
Страница 202: ...R3 IP21 UL Type 1 3AXD50000045323 202 Dimension drawings ...
Страница 203: ...R3 Option B056 IP55 UL Type 12 3AXD50000045322 Dimension drawings 203 ...
Страница 204: ...R6 IP21 UL Type 1 3AXD50000045353 204 Dimension drawings ...
Страница 205: ...R6 Option B056 IP55 UL Type 12 3AXD50000045352 Dimension drawings 205 ...
Страница 206: ...R8 IP21 UL Type 1 3AXD50000047667 206 Dimension drawings ...
Страница 207: ...R8 Option B056 IP55 UL Type 12 3AXD50000047667 Dimension drawings 207 ...
Страница 208: ...208 ...
Страница 225: ... Declarations of conformity The Safe torque off function 225 ...