
Making Management Connections
67
Verifying Network
Connectivity
To verify that the chassis and all modules have been installed correctly:
1
Confirm that communication can be established on all network segments
that you have enabled.
2
Confirm that the Network Activity LED on each installed module correctly
indicates network traffic status. Table 13 lists the Network Activity LED
status indicators.
Not all modules have Network Activity LEDs.
Table 13
Network Activity LED Status
10BASE-T Port Status
Network Activity LED Status
Link Down
Off
Receiving Traffic
Flashing Green
No Traffic (Port Enabled and Link Up)
Steady Green
Error
Steady Yellow
Содержание 4007
Страница 1: ...http www 3com com Switch 4007 Implementation Guide Release 3 0 5 Part No 10013673 Published May 2000 ...
Страница 36: ...36 ABOUT THIS GUIDE ...
Страница 37: ...I UNDERSTANDING YOUR SWITCH 4007 SYSTEM Chapter 1 Configuration Overview ...
Страница 38: ......
Страница 50: ...50 CHAPTER 1 CONFIGURATION OVERVIEW ...
Страница 52: ......
Страница 70: ...70 CHAPTER 3 INSTALLING MANAGEMENT MODULES ...
Страница 110: ...110 CHAPTER 4 CONFIGURING AND USING EME OPTIONS ...
Страница 130: ...130 CHAPTER 5 MANAGING THE CHASSIS POWER AND TEMPERATURE ...
Страница 222: ...222 CHAPTER 11 IP MULTICAST FILTERING WITH IGMP ...
Страница 240: ...240 CHAPTER 13 RESILIENT LINKS ...
Страница 304: ...304 CHAPTER 14 VIRTUAL LANS VLANS ...
Страница 350: ...350 CHAPTER 15 PACKET FILTERING ...
Страница 506: ...506 CHAPTER 19 OPEN SHORTEST PATH FIRST OSPF ROUTING ...
Страница 534: ...534 CHAPTER 20 IPX ROUTING ...
Страница 612: ...612 CHAPTER 22 QOS AND RSVP ...
Страница 656: ...656 CHAPTER 23 DEVICE MONITORING ...
Страница 657: ...IV REFERENCE Appendix A Technical Support Index ...
Страница 658: ......
Страница 664: ......