Page 18 of 28
801314UK - G4 Boiling chilled commercial installation instructions - June 2016 - V2.04
4.3 HydroTap
®
G4
models
Refer to 803341UK Tap installation instructions (for Arc / Cube also refer to
the tube kit assembly instructions) supplied with the tap.
Installation instructions
Note
The braided hoses and connection tubes supplied with the tap head assembly and cold inlet CANNOT
be lengthened. Also ensure that the (factory fitted) bypass tube assembly is fitted in place if the booster
and / or external filter are not used.
Not required for HydroTap
®
G4 models.
Note
Ambient mains
water braided hose length
is 750mm.
Electrical power cable
length is 3m nom.
Position the Command-
Centre
TM
according to the
hose and cable lengths
supplied.
Clearance envelope
535mm
COLD isolation valve
(not supplied)
535mm
Note
All silicon tubes /
plastic pipes must be cut
to size. They must have a
constant fall back to the
Command-Centre
TM
RED
CLEAR
BLUE
BRAIDED
CHILLED
OUTLET
MAINS
IN
MIXER
OUT
MIXER
IN
BOILING
OUT
BYPASS
IN
VENT BYPASS
OUT
Options
POWER
CABLE
USB
Booster option.
Arc / Cube
Elite
Classic