Page 20 of 28
801314UK - G4 Boiling chilled commercial installation instructions - June 2016 - V2.04
Installation instructions
4.5 All-in-One 'Mains' tap
Refer to 803341UK Tap installation instructions (for Arc / Cube also refer to
the tube kit assembly instructions) supplied with the tap.
T-piece and
Restrictaflow valve
(not supplied)
External HOT & COLD isolation valves
(not supplied)
Male to male adaptor
to T-piece (not supplied)
Note
Ambient mains
water braided hose
length is 750mm.
Electrical power cable
length is 3m nom.
Position the
Command-Centre
TM
according to the hose
and cable lengths
supplied.
Note
All silicon tubes / plastic pipes
must be cut to size. They must have a
constant fall back to the
Command-Centre
TM
Options
RED
CLEAR
BLUE
BRAIDED
POWER
CABLE
USB
CHILLED
OUTLET
MAINS
IN
MIXER
OUT
MIXER
IN
BOILING
OUT
BYPASS
IN
VENT BYPASS
OUT
Clearance envelope
535mm
535mm
Note
The braided hoses and connection tubes supplied with the tap head assembly and cold inlet CANNOT
be lengthened. Also ensure that the (factory fitted) bypass tube assembly is fitted in place if the booster
and / or external filter are not used.
Not required for standard AIO 'Mains' HydroTap
®
G4 models.
Booster option