ZAHD, ZAEHD 150/200-155/175
Installation
29
www.zepro.com
4.6
Underrun protection
Test the position of the underrun protection without
tightening the bolts to check that the statutory
dimensions are obtained. Adjust if necessary then
tighten the bolts with a torque wrench.
1.
Fit the outer part of each bracket at one of five posi
-
tions. Select a position that meets the statutory re-
quirements. Use the corresponding bolts M12x80.
Install the screws in the hole pattern according to
Image 45, at the far end of the lower row of holes
and next to the far end in the upper one. Assemble
without tightening the bolts.
NOTE!
The underrun protection may be placed further back
and lower.
2. Check that the installation meets the statutory
requirements.
3. Tighten all the bolts using a torque wrench.
Tighten-
ing torque: 80 Nm.
4. Fit the member end caps, rotated so the logo is
the right way up, and press them firmly to secure.
If necessary, tap carefully with a rubber hammer.
535
585
635
685
735
Image 45. Installing underrun protection
Image 46. The outer part of the brack-
ets can be fitted in one of five positions
Image 47. Fit the member end caps
Summary of Contents for ZAHD 150/200
Page 2: ......