ZAHD, ZAEHD 150/200-155/175
Contents
3
www.zepro.com
Contents
1 Important information ....................................................................................... 5
1.1 Attention!
.....................................................................................................5
1.2 Technical support
.........................................................................................5
1.3 Identifikation
................................................................................................6
1.4 CE marking
....................................................................................................6
1.5 Product approval
.........................................................................................6
1.6 Hydraulic oil
..................................................................................................6
1.7 Guarantee
.....................................................................................................6
1.8 Repainting
.....................................................................................................7
1.9 Battery maintenance
....................................................................................7
1.10 Configuration
................................................................................................8
2 Safety rules ........................................................................................................ 9
2.1 Moving parts - free movement
.....................................................................9
2.2 Connection of third-party equipment is forbidden
......................................9
2.3 Installation
....................................................................................................9
3 Before installation ............................................................................................ 10
3.1 Vehicle chassis requirements
.....................................................................10
3.2 Statutory dimensions for underrun protection
..........................................10
3.3 Calculating the installed dimensions
..........................................................12
3.4 Rear beam cut outs
....................................................................................16
3.5 Prepare the tail lift
......................................................................................16
3.6 Temporary connection
................................................................................18
4 Installation
...................................................................................................... 21
4.1 Support Frame
...........................................................................................21
4.2 Platform
......................................................................................................23
4.3 Armstops
....................................................................................................28
4.4 Sealing strip (horizontal)
.............................................................................28
4.5 Sealing strip (vertical)
.................................................................................28
4.6 Underrun protection
..................................................................................29
4.7 Angle sensor / Inclinometer
.......................................................................30
4.8 Controllers
..................................................................................................32
5 Cable routing ................................................................................................... 34
5.1 General
.......................................................................................................34
5.3 Maximum power consumption
..................................................................35
5.2 Battery maintenance
..................................................................................35
5.4 Purging the cylinders
..................................................................................36
5.5 Platform tilt speed
......................................................................................36
5.6 Main power cable, earth cable, main fuse and main switch
......................37
5.7 Control power cable
...................................................................................39
5.8 Open platform alarm
..................................................................................39
5.9 Foot controller / Warning lights
.................................................................39
6 Connection ....................................................................................................... 40
6.1 Connection unit
..........................................................................................40
6.2 Connection
.................................................................................................41
Summary of Contents for ZAHD 150/200
Page 2: ......