Z 1500/2000-135/155/175
40
Cable routing
www.zepro.com
5.3.1 Main power switch
1. The main power switch is installed on the bracket at the factory. Bolt the bracket to the underside of the
body. Use the self-adhesive drilling template supplied.
2. Connect the main power switch cable to the quick connector on the tail lift power supply cable.
3. Connect the power supply cable to the other quick connector on the main power switch cabling.
4.
Run the power supply cable from the main power switch to the fuse box / battery positive terminal. Pre
-
pare the cable with a cable terminal and shrink hose without connecting. Connection is described later in
section 6.
Figure 70. Installing the main power switch
Drainage
IMPORTANT
!
The positive cable to the battery and main fuse is connected later in Section
7, after the cable has been routed/installed.
Summary of Contents for Z 1500
Page 2: ......