4-9
3. Move the machine forward
1) Adjust the control box to the free position, raise
the working device and lift it 40 to 50 cm off the
ground.
2) Follow the steps below to operate the left and
right travel joystick.
When the dozer blade is in front:
Slowly push the front of the joystick forward to
move the machine.
When the dozer blade is in the rear of the machine:
Slowly pull back the joystick to move the machine.
Attention: If the travel speed of the
machine is abnormal at low temperatures,
it is necessary to thoroughly warm up the
machine. In addition, if the lower body of
the machine is blocked by soil and the
travel speed is abnormal, please make sure
to remove the dirt and soil.
4. Reverse the machine
1) Adjust the control box to the free position, raise
the working device and lift it 40 to 50 cm off the
ground.
2) The operation is in reverse order for moving
forward.
5. Park the machine
Place the left and right joysticks in the center
position to park the machine.
Attention: Avoid sudden stopping of the
machine while traveling; there should be
sufficient space for parking.
Summary of Contents for U35
Page 5: ...1 1 1 Preface...
Page 15: ...2 1 2 Safety regulations...
Page 45: ...3 1 3 Introduction of components...
Page 70: ...4 1 4 Operation guide...
Page 90: ...4 21 6 After the engine shuts down reset the shutdown lever...
Page 104: ...5 1 5 Maintenance...
Page 147: ...6 1 6 Accessories guide...