![background image](http://html1.mh-extra.com/html/york/r-410a/r-410a_technical-and-service-manual_3503981273.webp)
Installation
___________________________________________________________________________________
___________________________________________________________________________________
- 272 -
For construction convenience, before laying pipes, use insulation material to insulate the
pipes to be deal with, at the same time, at two tips of the pipe, remains some length not to be
insulated, in order to be welded and check the leakage after laying the pipes.
6.2.3 Insulate for the jointing area, expanding area and the flange area
6.2.3.1 Insulate for the jointing area, expanding area and the flange area should be done after
checking leakage of the pipes
6.2.3.2 Make sure there’s no clearance in the joining part of the accessorial insulation material
and local preparative insulation material.
6.2.4 Enswathe disposal
After insulation of the pipes, do the enswathe disposal with binding belt, make sure it’s tight.
Summary of Contents for R-410A
Page 103: ...Wall mount 102 Part 4 2 Wall Mounted...
Page 113: ...Wall mount 112 4 Dimensions 4 1 YDS 22 36EC 4 2 YDS 45 56EC...
Page 115: ...Wall mount 114 5 Piping Diagrams 5 1 YDS 22 56EC 5 2 YDS 22 56HC...
Page 116: ...Wall mount 115 6 Wiring diagrams 6 1 YDS 22 36EC 6 2 YDS 45 56EC...
Page 117: ...Wall mount 116 6 3 YDS 22 56HC...
Page 118: ...Wall mount 117 7 Sound level 7 1 Test condition 7 2 Noise spectrums YDS 22 36EC HC...
Page 119: ...Wall mount 118 YDS 45 56EC HC...
Page 120: ...Wall mount 119 8 Velocity temperature distribution Discharge angle 70...