<4.OPERATION>
4-1
IM 11G02N01-01E
4. OPERATION
4.1 Preparation for operation
(1) Tube and wiring check
Double-check if tubes of the gas sampling and exhaust ports are correctly connected.
Double-check for proper wiring.
4.2 Warm-up operation and regular operation
(1) Operation procedure
1) Turn ON the power switch on the front panel of the analyzer unit.
The measurement screen appears on the front display panel in 1 or 2 seconds.
2) Wait for about 4 hours until the instrument is warmed up.
About 4 hours are required until the instrument allows accurate measurement.
Note) When in warm-up, the concentration reading may be beyond.
upper limit of range or
lower limit of range.
But, it is not an error.
3) Setting of various set values
Perform the various settings according to “Chapter 6. Setting and Calibration”.
4) Zero calibration and span calibration
Perform zero calibration and span calibration after warm-up operation.
Refer to “Chapter 6.9. Calibration”.
5) Introduction and measurement of measuring gas
Introduce the measuring gas into the analyzer unit before starting measurement.
Summary of Contents for IR400 series
Page 1: ...User s Manual R Model IR400 Infrared Gas Analyzer IM 11G02N01 01E IM 11G02N01 01E 5th Edition ...
Page 7: ...Blank Page ...
Page 11: ...Blank Page ...
Page 33: ...Blank Page ...
Page 35: ...Blank Page ...
Page 83: ...Blank Page ...
Page 93: ...Blank Page ...
Page 97: ...Blank Page ...
Page 117: ...Blank Page ...