Ind-4
TI 33Q01J10-01E
Sep. 30, 2008-00
P
Paint Colors .........................................................4-19
Parts Durability ....................................................4-12
Passage ................................................................2-4
PFCS/PFCD Field Control Station .............3-18, 4-17
Post-installation Environment Preservation ..........5-1
Post-installation Inspection ...................................5-1
Post-installation Inspection and Environmental
Preservation ..................................................5-1
Power and Ground Cabling ................................3-12
Power Cables ........................................................3-2
Power Cable Termination ......................................3-7
Power Distribution Boards ....................................3-8
Power Supply System .........................................1-14
Power Wiring When Connecting Dual Power
Supply Lines ................................................3-20
Precautions for Transportation ..............................2-2
Pressure Clamp Terminal ..........................3-30, 3-53
Pressure Clamp Terminal (for ARS
Pressure Clamp Terminal (for Pressure Clamp
Terminal Block) ............................................3-32
Process I/O Signal Connection ...........................3-30
Providing Area for Servicing ................................2-28
Providing Ground Bus in Cabinet/Console
Type HIS ......................................................1-23
Providing Space for Heat Radiation ....................2-27
R
Redundant AAM50/AAM51 ................................3-70
Relay Input Module ADM15R .............................3-73
Relay Output Module ADM55R ..........................3-73
RIO Bus .............................................................3-102
RIO Bus (19-inch Rack Mountable Type) .........3-102
RIO Bus (with Cabinet) .....................................3-103
RIO Bus Arrangement .......................................3-104
RIO bus Cabling ..................................................3-45
RIO Node Wiring in FCU Cabinet .......................3-41
RIO Node Wiring in I/O Expansion Cabinet ........3-42
Routing Signal Cables ...............................3-34, 3-41
RS-232C Communication Card ACM21 .............3-82
RS-232C Communication Module ACM11 .........3-78
RS-422/RS-485 Communication
Card ACM22 ................................................3-83
RS-422/RS-485 Communication Module
ACM12 .........................................................3-81
RTD Input Modules AMM32T, AMM32TJ ...........3-74
Rules of Connection for the Housekeeping Unit
(HKU) ...........................................................4-20
S
Safety Standards ..................................................1-8
Selecting a Power System ..................................1-16
Separate Grounding ...........................................1-22
Separator ............................................................1-31
Servicing Area .......................................................2-9
Side-by-Side Cabinet Installation .........................1-4
Signal Cables ........................................................3-2
Signal Cables for Connection with RIO ..............3-65
Signal Cable Termination ....................................3-31
Size of Cabling Holes in Floor .............................2-14
Sleeve for pressure clamp terminal ......................3-4
Solderless (crimp-on) Lug Specifications .............3-7
Solderless Lug ................................... 3-3, 3-30, 3-31
Source Output Capacity ......................................1-16
Standards for Hazardous Location Equipment ....1-9
Status Contact Output Connection ...................3-107
Steel Floor ........................................................... 2-11
Storage ..................................................................2-8
Storage Condition .................................................2-8
Storage Environment ............................................2-8
Storage of Packed Equipment ..............................2-8
Storage of Unpacked Equipment ..........................2-8
Structure of Clamp Filter and Mounting ..............3-80
Suppressing Harmonic Current ..........................1-17
System Installation Requirements ........................1-1
T
Telephone .............................................................1-4
Temperatures and Humidity ..................................1-5
Terminal Connection .............................................3-9
Three-pin Plug Connection ...................................3-9
Tools and Parts Required for Joining
Cabinets ......................................................2-22
Tools and Parts Required for Joining Console
Type HIS side by side ..................................2-19
To Use GI 62.5/125 Optical Fiber Cable ...........3-106
Transportation .......................................................2-2
Transportation, Storage and Installation ...............2-1
Transportation for LPCKIT, YPCKIT .....................2-2
Type and Maximum Length of Power Cables .......3-5