3. PRE-OPERATION PROCEDURES
Installation Precautions
Choose an appropriate installation site.
DO NOT install unit:
・
where installation surface is not completely level, not even or not clean.
・
where flammable or corrosive gases/fumes may be present.
・
where external temperature will exceed 35
°C
, will fall below 5
°C
or will fluctuate largely.
・
in excessively humid or dusty locations.
・
in direct sunlight or outdoors.
・
where there is constant vibration.
・
in direct contact with the outside air
・
where power supply is erratic.
・
where there is a risk of freezing or condensation.
・
where raw water pressure is higher than 5.0 × 100 kPa
・
where raw water pressure is lower than 0.5 × 100 kPa
Install WG series unit in a location with sufficient space, as specified below.
Use cargo-handling equipment for transportation and installation.
Always use cargo-handling equipment to move or install unit. Transport unit with sufficient
number of people and an appropriate work method when carrying out manually.
Since WG1001, in particular, has a high center of gravity, exercise caution in transportation.
10cm以上
10cm以上
10 cm or more
10 cm or more
10 cm or more