50
7. INSPECTION AND MAINTENANCE
Washing of Distiller
2. Connect the four heater lead wires to the terminal block.
3. Replace the left side panel.
4. Insert a hose into boiler water inlet/drain port and fix it with a hose band.
●
Installation of condenser
1. Insert a gasket between the connection ports of boiler and condenser. Secure boiler and
condenser in the same orientation using the attachment bracket.
2. Connect each hose to cooling water inlet, outlet, and distilled water outlet of condenser. Close
boiler drain cock.
Overhead view
Terminal block
Heater lead wire (thick)
Heater lead wire (thin)
IN
OUT
Boiler
Fitting
Condenser
OPEN
CLOSE