PERIODIC MAINTENANCE
3-34
14.Pour the specified coolant into the radiator
until it is full.
15.Install:
• Radiator cap
16.Start the engine, warm it up for several min-
utes, and then turn it off.
17.Check:
• Coolant level
Refer to “CHECKING THE COOLANT LEV-
EL” on page 3-31.
TIP
Before checking the coolant level, wait a few
minutes until the coolant has settled.
18.Install:
• Front muffler protector (right)
• Front side cowling (right)
Refer to “GENERAL CHASSIS (5)” on page
4-16.
EAS31389
ADJUSTING THE EXUP CABLES
1. Remove:
• EXUP valve pulley cover “1”
2. Check:
• EXUP system operation
a. Activate the diagnostic mode and select
the diagnostic code number “53”.
Refer to “FUEL INJECTION SYSTEM” on
page 9-11.
b. Set the start/engine stop switch to “
”.
c. Check that the EXUP valve operates prop-
erly.
TIP
Check that the projection “a” on the EXUP valve
pulley contacts the stopper “b” (fully open posi-
tion). If the projection does not contact the stop-
per, adjust the EXUP cable free play.
3. Adjust:
• EXUP cable free play
a. Turn the main switch to “ON”.
b. Loosen the locknut “1”.
c. Turn the adjusting nut “2” until the projec-
tion “a” on the EXUP valve pulley slightly
contacts the stopper “b” and make sure
the EXUP cable (black metal) “3” is not
slack.
d. Tighten the locknut “1” to specification.
e. Loosen the locknut “4”.
f. Turn the adjusting nut “5” until the tension
of the EXUP cable (white metal) “6” is the
same as that of the EXUP cable (black
metal) “3”.
g. Tighten the locknut “4” to specification.
1
T
R
.
.
EXUP cable locknut
6 N·m (0.6 kgf·m, 4.4 lb·ft)
T
R
.
.
EXUP cable locknut
6 N·m (0.6 kgf·m, 4.4 lb·ft)
a
b
1
3
2
b
a
Summary of Contents for YZF-R1
Page 2: ......
Page 6: ......
Page 8: ......
Page 38: ...SPECIAL TOOLS 1 29 ...
Page 55: ...TIGHTENING TORQUES 2 16 ...
Page 60: ...CABLE ROUTING 2 21 Frame rear right side view B A C D 2 1 2 3 4 5 6 7 ...
Page 82: ...CABLE ROUTING 2 43 Front brake hose left side view A 1 1 1 1 2 2 2 3 3 3 4 4 4 3 4 ...
Page 86: ...CABLE ROUTING 2 47 Fuel tank top and left side view A B 1 2 3 4 5 2 5 ...
Page 92: ...CABLE ROUTING 2 53 Air cut off valve right side view A B C C D E 1 2 2 3 3 3 4 4 5 5 5 6 7 ...
Page 100: ...CABLE ROUTING 2 61 Muffler top and left side view 1 1 2 3 3 4 5 5 6 6 4 4 5 6 5 6 A ...
Page 104: ...CABLE ROUTING 2 65 ...
Page 107: ......
Page 144: ...PERIODIC MAINTENANCE 3 37 ...
Page 149: ......
Page 171: ...GENERAL CHASSIS 5 4 22 T R Front muffler protector bolt 7 N m 0 7 kgf m 5 2 lb ft b b a a 1 ...
Page 280: ...CHAIN DRIVE 4 131 ...
Page 336: ...ELECTRIC STARTER 5 53 1 2 3 a b ...
Page 406: ...WATER PUMP 6 17 ...
Page 432: ...AIR INDUCTION SYSTEM 7 25 ...
Page 435: ......
Page 441: ...IGNITION SYSTEM 8 6 ...
Page 449: ...CHARGING SYSTEM 8 14 ...
Page 453: ...LIGHTING SYSTEM 8 18 ...
Page 488: ...ELECTRICAL COMPONENTS 8 53 ...
Page 497: ......
Page 507: ...SYSTEM DIAGRAM 9 10 ...
Page 525: ...STEERING DAMPER SYSTEM 9 28 ...
Page 800: ...91_ABS 9 303 4 Defective hydraulic unit assembly Replace the hydraulic unit assembly ...
Page 801: ...91_ABS 9 304 ...
Page 804: ......
Page 805: ......
Page 806: ......