
CONNECTING RODS AND PISTONS
5-83
b. Wait five minutes to dry the remaining oil
cleaner component.
c. Install the big end upper bearing into the
connecting rod and the big end lower
bearing into the connecting rod cap with
the connecting rod big end metal installer
“1”.
TIP
• From the 3 types, choose the connecting rod
big end metal installer “1” that fits exactly, and
install it to the connecting rod and connecting
rod cap as shown in the illustration.
• Align the projections “a” on the big end bear-
ings with the notches “b” in the connecting rod
and connecting rod cap.
• Push the big end bearing “2” down and install it
to the connecting rod and connecting rod cap.
d. Put a piece of Plastigauge® “1” on the
crankshaft pin.
e. Assemble the connecting rod halves.
NOTICE
ECA18390
Tighten the connecting rod bolts using the
plastic-region tightening angle method. Al-
ways install new bolts.
TIP
• Install the new connecting rod bolt without
cleaning and without any oil.
• Make sure that the projection “a” on the con-
necting rod cap faces the same direction as the
“ ” mark “b” on the connecting rod.
• After installing the big end bearing, assemble
the connecting rod and connecting rod cap
without installing them onto the crankshaft.
Connecting rod big end bearing
installer
90890-04193
Connecting rod big end bearing
installer
YM-04193
a
b
1
1
1
a
b
1
2
1
G0
8
900
8
Summary of Contents for YZF-R1
Page 2: ......
Page 6: ......
Page 8: ......
Page 38: ...SPECIAL TOOLS 1 29 ...
Page 55: ...TIGHTENING TORQUES 2 16 ...
Page 60: ...CABLE ROUTING 2 21 Frame rear right side view B A C D 2 1 2 3 4 5 6 7 ...
Page 82: ...CABLE ROUTING 2 43 Front brake hose left side view A 1 1 1 1 2 2 2 3 3 3 4 4 4 3 4 ...
Page 86: ...CABLE ROUTING 2 47 Fuel tank top and left side view A B 1 2 3 4 5 2 5 ...
Page 92: ...CABLE ROUTING 2 53 Air cut off valve right side view A B C C D E 1 2 2 3 3 3 4 4 5 5 5 6 7 ...
Page 100: ...CABLE ROUTING 2 61 Muffler top and left side view 1 1 2 3 3 4 5 5 6 6 4 4 5 6 5 6 A ...
Page 104: ...CABLE ROUTING 2 65 ...
Page 107: ......
Page 144: ...PERIODIC MAINTENANCE 3 37 ...
Page 149: ......
Page 171: ...GENERAL CHASSIS 5 4 22 T R Front muffler protector bolt 7 N m 0 7 kgf m 5 2 lb ft b b a a 1 ...
Page 280: ...CHAIN DRIVE 4 131 ...
Page 336: ...ELECTRIC STARTER 5 53 1 2 3 a b ...
Page 406: ...WATER PUMP 6 17 ...
Page 432: ...AIR INDUCTION SYSTEM 7 25 ...
Page 435: ......
Page 441: ...IGNITION SYSTEM 8 6 ...
Page 449: ...CHARGING SYSTEM 8 14 ...
Page 453: ...LIGHTING SYSTEM 8 18 ...
Page 488: ...ELECTRICAL COMPONENTS 8 53 ...
Page 497: ......
Page 507: ...SYSTEM DIAGRAM 9 10 ...
Page 525: ...STEERING DAMPER SYSTEM 9 28 ...
Page 800: ...91_ABS 9 303 4 Defective hydraulic unit assembly Replace the hydraulic unit assembly ...
Page 801: ...91_ABS 9 304 ...
Page 804: ......
Page 805: ......
Page 806: ......