AIR INDUCTION SYSTEM
7-23
EAS27060
CHECKING THE AIR INDUCTION SYSTEM
Air induction
The air induction system burns unburned ex-
haust gases by injecting fresh air (secondary air)
into the exhaust port, reducing the emission of
hydrocarbons. When there is negative pressure
at the exhaust port, the reed valve opens, allow-
ing secondary air to flow into the exhaust port.
The required temperature for burning the un-
burned exhaust gases is approximately 600 to
700 °C (1112 to 1292 °F).
Air cut-off valve
The air cut-off valve is controlled by the signals
from the ECU in accordance with the combus-
tion conditions. Ordinarily, the air cut-off valve
opens when the coolant temperature is below
the specified value to allow the air to flow into the
exhaust pipe assembly. When the engine is
warm, the air cut-off valve opens while the vehi-
cle is decelerating if the throttle grip is in the fully
close position.
1. Check:
• Hoses
Loose connections
→
Connect properly.
Cracks/damage
→
Replace.
2. Check:
• Reed valve
• Reed valve stopper
• Reed valve seat
Cracks/damage
→
Replace the reed valve
assembly.
3. Check:
• Air cut-off valve
Cracks/damage
→
Replace.
4. Check:
• Air induction system solenoid
Refer to “CHECKING THE AIR INDUCTION
SYSTEM SOLENOID” on page 8-138.
A. From the air filter case
B. To the cylinder head
A
B
B
A
B
B
Summary of Contents for Vmax VMX17C 2009
Page 1: ...2009 SERVICE MANUAL VMX17Y C LIT 11616 22 64 2S3 28197 10 ...
Page 6: ......
Page 8: ......
Page 52: ...SPECIAL TOOLS 1 43 ...
Page 85: ...LUBRICATION POINTS AND LUBRICANT TYPES 2 32 ...
Page 90: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 37 1 4 5 2 3 ...
Page 92: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 39 A 2 A 4 3 2 1 ...
Page 94: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 41 A A 1 A A 7 6 8 5 4 3 2 ...
Page 98: ...COOLING SYSTEM DIAGRAMS 2 45 6 1 2 3 4 5 2 3 4 5 7 6 8 9 A B C F E D ...
Page 102: ...CABLE ROUTING 2 49 A B B A B B A B C D E F F H I 1 2 3 4 4 5 6 7 8 G 6 ...
Page 106: ...CABLE ROUTING 2 53 A B 7 1 2 3 4 5 6 12 11 13 F E D 10 C G 14 9 8 ...
Page 110: ...CABLE ROUTING 2 57 A A A B D E F H 1 2 2 3 4 3 5 6 7 8 9 C 4 5 G ...
Page 114: ...CABLE ROUTING 2 61 A A A A A B C 1 2 3 4 5 6 7 8 9 10 11 ...
Page 120: ...CABLE ROUTING 2 67 B A C C B A C C A B C D E F G H I J 1 2 1 2 5 1 2 3 5 3 4 5 ...
Page 124: ...CABLE ROUTING 2 71 ...
Page 127: ......
Page 270: ...SHAFT DRIVE 4 105 ...
Page 316: ...GENERATOR AND STARTER CLUTCH 5 43 a 1 ...
Page 364: ...CONNECTING RODS AND PISTONS 5 91 a ...
Page 390: ...MIDDLE GEAR 5 117 ...
Page 406: ...WATER PUMP 6 15 ...
Page 425: ...THROTTLE BODIES 7 18 1 ...
Page 426: ...AIR INDUCTION SYSTEM 7 19 EAS27040 AIR INDUCTION SYSTEM A A 6 5 4 5 6 1 4 3 3 2 1 A B C D ...
Page 433: ......
Page 439: ...IGNITION SYSTEM 8 6 ...
Page 445: ...ELECTRIC STARTING SYSTEM 8 12 ...
Page 447: ...CHARGING SYSTEM 8 14 1 AC magneto 2 Rectifier regulator 6 Main fuse 8 Battery 9 Frame ground ...
Page 449: ...CHARGING SYSTEM 8 16 ...
Page 461: ...SIGNALING SYSTEM 8 28 ...
Page 465: ...COOLING SYSTEM 8 32 ...
Page 501: ...FUEL INJECTION SYSTEM 8 68 ...
Page 505: ...FUEL PUMP SYSTEM 8 72 ...
Page 509: ...ABS ANTI LOCK BRAKE SYSTEM 8 76 ...
Page 549: ...ABS ANTI LOCK BRAKE SYSTEM 8 116 ...
Page 552: ...ELECTRICAL COMPONENTS 8 119 3 4 5 6 2 1 7 8 9 10 11 12 13 14 15 16 17 18 19 ...
Page 574: ...ELECTRICAL COMPONENTS 8 141 ...
Page 581: ......
Page 582: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN ...