CLUTCH
5-59
EAS25260
INSTALLING THE CLUTCH
1. Install:
• Clutch boss plate “1”
• Clutch boss “2”
TIP
Assemble the clutch boss and clutch boss plate
so that the rivets “a” in the clutch boss are
aligned with the notches “b” in the clutch boss
plate.
2. Install:
• Clutch boss “1”
• Springs
• Clutch boss nut “2”
TIP
• Lubricate the clutch boss nut threads with en-
gine oil.
• While holding the clutch boss with the univer-
sal clutch holder “3”, tighten the clutch boss
nut.
• Stake the clutch boss nut at a cutout “a” in the
main axle.
3. Lubricate:
• Friction plates
• Clutch plates
(with the recommended lubricant)
4. Install:
• Friction plates
• Clutch plates
TIP
• First, install a friction plate and then alternate
between a clutch plate and a friction plate.
• Install the last friction plate “1” offset from the
other friction plates “2”, making sure to align a
projection on the friction plate with the punch
mark “a” on the clutch housing.
5. Install:
• Clutch spring plate “1”
• Clutch spring plate retainer “2”
TIP
Tighten the clutch spring plate retainer bolts in
stages and in a crisscross pattern.
T
R
.
.
Clutch boss nut
95 Nm (9.5 m·kgf, 68 ft·lbf)
Universal clutch holder
90890-04086
YM-91042
1
2
1
a
a
a
b
b
b
New
Recommended lubricant
Engine oil
T
R
.
.
Clutch spring plate retainer bolt
8 Nm (0.8 m·kgf, 5.8 ft·lbf)
1
2
3
a
New
1
a
2
Summary of Contents for Vmax VMX17C 2009
Page 1: ...2009 SERVICE MANUAL VMX17Y C LIT 11616 22 64 2S3 28197 10 ...
Page 6: ......
Page 8: ......
Page 52: ...SPECIAL TOOLS 1 43 ...
Page 85: ...LUBRICATION POINTS AND LUBRICANT TYPES 2 32 ...
Page 90: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 37 1 4 5 2 3 ...
Page 92: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 39 A 2 A 4 3 2 1 ...
Page 94: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 41 A A 1 A A 7 6 8 5 4 3 2 ...
Page 98: ...COOLING SYSTEM DIAGRAMS 2 45 6 1 2 3 4 5 2 3 4 5 7 6 8 9 A B C F E D ...
Page 102: ...CABLE ROUTING 2 49 A B B A B B A B C D E F F H I 1 2 3 4 4 5 6 7 8 G 6 ...
Page 106: ...CABLE ROUTING 2 53 A B 7 1 2 3 4 5 6 12 11 13 F E D 10 C G 14 9 8 ...
Page 110: ...CABLE ROUTING 2 57 A A A B D E F H 1 2 2 3 4 3 5 6 7 8 9 C 4 5 G ...
Page 114: ...CABLE ROUTING 2 61 A A A A A B C 1 2 3 4 5 6 7 8 9 10 11 ...
Page 120: ...CABLE ROUTING 2 67 B A C C B A C C A B C D E F G H I J 1 2 1 2 5 1 2 3 5 3 4 5 ...
Page 124: ...CABLE ROUTING 2 71 ...
Page 127: ......
Page 270: ...SHAFT DRIVE 4 105 ...
Page 316: ...GENERATOR AND STARTER CLUTCH 5 43 a 1 ...
Page 364: ...CONNECTING RODS AND PISTONS 5 91 a ...
Page 390: ...MIDDLE GEAR 5 117 ...
Page 406: ...WATER PUMP 6 15 ...
Page 425: ...THROTTLE BODIES 7 18 1 ...
Page 426: ...AIR INDUCTION SYSTEM 7 19 EAS27040 AIR INDUCTION SYSTEM A A 6 5 4 5 6 1 4 3 3 2 1 A B C D ...
Page 433: ......
Page 439: ...IGNITION SYSTEM 8 6 ...
Page 445: ...ELECTRIC STARTING SYSTEM 8 12 ...
Page 447: ...CHARGING SYSTEM 8 14 1 AC magneto 2 Rectifier regulator 6 Main fuse 8 Battery 9 Frame ground ...
Page 449: ...CHARGING SYSTEM 8 16 ...
Page 461: ...SIGNALING SYSTEM 8 28 ...
Page 465: ...COOLING SYSTEM 8 32 ...
Page 501: ...FUEL INJECTION SYSTEM 8 68 ...
Page 505: ...FUEL PUMP SYSTEM 8 72 ...
Page 509: ...ABS ANTI LOCK BRAKE SYSTEM 8 76 ...
Page 549: ...ABS ANTI LOCK BRAKE SYSTEM 8 116 ...
Page 552: ...ELECTRICAL COMPONENTS 8 119 3 4 5 6 2 1 7 8 9 10 11 12 13 14 15 16 17 18 19 ...
Page 574: ...ELECTRICAL COMPONENTS 8 141 ...
Page 581: ......
Page 582: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN ...