CYLINDER HEADS
5-28
TIP
Pass the timing chains through the timing chain
cavity.
2. Tighten:
• Cylinder head bolts
WARNING
EWA2S31032
Replace the bolts with new ones.
TIP
Tighten the bolts using the following procedure.
▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼▼▼
a. Lubricate the cylinder head bolts with engine
oil.
b. Install the cylinder head bolts.
c. Tighten the cylinder head bolts in the proper
tightening sequence as shown.
d. Tighten the cylinder head bolts further to
reach the specified angle 85–95° in the prop-
er tightening sequence as shown.
WARNING
EWA2S31035
If the bolt is tightened more than the speci-
fied angle, do not loosen the bolt and then re-
tighten it. Instead, replace the bolt with a new
one and perform the procedure again.
NOTICE
ECA2S31041
• Do not use a torque wrench to tighten the
bolt to the specified angle.
• Tighten the bolt until it is at the specified
angle.
TIP
On a hexagonal bolt, note that the angle from
one corner to another is 60°.
▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲▲▲
T
R
.
.
Cylinder head bolt
1st
30 Nm (3.0 m·kgf, 22 ft·lbf)
T
R
.
.
Cylinder head bolt
Final
Specified angle 85–95°
New
A. Front cylinder head
B. Rear cylinder head
A
6
4
2
7
8
1
3
5
FWD
B
8
1
3
5
6
4
2
7
FWD
85–95˚
Summary of Contents for Vmax VMX17C 2009
Page 1: ...2009 SERVICE MANUAL VMX17Y C LIT 11616 22 64 2S3 28197 10 ...
Page 6: ......
Page 8: ......
Page 52: ...SPECIAL TOOLS 1 43 ...
Page 85: ...LUBRICATION POINTS AND LUBRICANT TYPES 2 32 ...
Page 90: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 37 1 4 5 2 3 ...
Page 92: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 39 A 2 A 4 3 2 1 ...
Page 94: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 41 A A 1 A A 7 6 8 5 4 3 2 ...
Page 98: ...COOLING SYSTEM DIAGRAMS 2 45 6 1 2 3 4 5 2 3 4 5 7 6 8 9 A B C F E D ...
Page 102: ...CABLE ROUTING 2 49 A B B A B B A B C D E F F H I 1 2 3 4 4 5 6 7 8 G 6 ...
Page 106: ...CABLE ROUTING 2 53 A B 7 1 2 3 4 5 6 12 11 13 F E D 10 C G 14 9 8 ...
Page 110: ...CABLE ROUTING 2 57 A A A B D E F H 1 2 2 3 4 3 5 6 7 8 9 C 4 5 G ...
Page 114: ...CABLE ROUTING 2 61 A A A A A B C 1 2 3 4 5 6 7 8 9 10 11 ...
Page 120: ...CABLE ROUTING 2 67 B A C C B A C C A B C D E F G H I J 1 2 1 2 5 1 2 3 5 3 4 5 ...
Page 124: ...CABLE ROUTING 2 71 ...
Page 127: ......
Page 270: ...SHAFT DRIVE 4 105 ...
Page 316: ...GENERATOR AND STARTER CLUTCH 5 43 a 1 ...
Page 364: ...CONNECTING RODS AND PISTONS 5 91 a ...
Page 390: ...MIDDLE GEAR 5 117 ...
Page 406: ...WATER PUMP 6 15 ...
Page 425: ...THROTTLE BODIES 7 18 1 ...
Page 426: ...AIR INDUCTION SYSTEM 7 19 EAS27040 AIR INDUCTION SYSTEM A A 6 5 4 5 6 1 4 3 3 2 1 A B C D ...
Page 433: ......
Page 439: ...IGNITION SYSTEM 8 6 ...
Page 445: ...ELECTRIC STARTING SYSTEM 8 12 ...
Page 447: ...CHARGING SYSTEM 8 14 1 AC magneto 2 Rectifier regulator 6 Main fuse 8 Battery 9 Frame ground ...
Page 449: ...CHARGING SYSTEM 8 16 ...
Page 461: ...SIGNALING SYSTEM 8 28 ...
Page 465: ...COOLING SYSTEM 8 32 ...
Page 501: ...FUEL INJECTION SYSTEM 8 68 ...
Page 505: ...FUEL PUMP SYSTEM 8 72 ...
Page 509: ...ABS ANTI LOCK BRAKE SYSTEM 8 76 ...
Page 549: ...ABS ANTI LOCK BRAKE SYSTEM 8 116 ...
Page 552: ...ELECTRICAL COMPONENTS 8 119 3 4 5 6 2 1 7 8 9 10 11 12 13 14 15 16 17 18 19 ...
Page 574: ...ELECTRICAL COMPONENTS 8 141 ...
Page 581: ......
Page 582: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN ...