5. REMOVAL OF ENGINE, TRANSMISSION SYSTEM AND GEARSHIFT
5-5
Installation of engine
Put engine on the bodywork. first, install two
bolt and nut, then, install upper bracke and
rear bracket.
Tighten moment
£
ŗ
upper bracke of engine:
35
~
45N·m
Removal and Installation of Front and
Adown fixing bolt of engine:
50
~
60N·m
Rear axle
Install water inlet and out let hose in the en-
Disassembly
gine by hoop Hang the bodywork in the air by jack, keep it
Install anode and cathode cable of starting doesn’t falling.
Joint the connector of electrical cable. Remove cover parts(
→
Chapter 2)
Install cap of spark plug Remove front and rear wheels and rocker
Install shift of gearshift (
→
Chapter 8 Chapter 9)
Install air filter,carburetor and other parts Remove air filter
after remove. Remove carburetor
Remove engine
Remove rear brake caliper
(→
Chapter 9)
Summary of Contents for XY500UTV
Page 1: ......
Page 2: ...Service Manual XY500UTV XY500LUTV XY500UE XY500UEL 4 4 ZHEJIANG XINYANG INDUSTRY CO LTD ...
Page 16: ...1 SERVICE INFORMATION 1 13 Cables Pipes Cable Routing 1 ...
Page 17: ...1 SERVICE INFORMATION 1 14 ...
Page 18: ...1 SERVICE INFORMATION 1 15 Carburetor Condition 1 ...
Page 19: ...1 SERVICE INFORMATION 1 16 Carburetor Condition EFI Condition ...
Page 20: ...1 SERVICE INFORMATION 1 17 Carburetor Condition 1 ...
Page 21: ...1 SERVICE INFORMATION 1 18 ...
Page 41: ...2 VEHICLE BODY MUFFLER 2 20 Description of visible parts ...
Page 44: ......
Page 66: ...4 COOLING AND LUBRICATIING SYSTEM 4 2 Cooling System Illustration 4 ...
Page 114: ...6 ENGINE REMOVAL INSPECTION INSTALLATION 6 29 Primary and Secondary Sheave 6 ...
Page 225: ......