6. ENGINE REMOVAL; INSPECTION & INSTALLATION
6-58
●
Install secondary sheave;
●
Install primary sliding sheave
●
Tighten primary sheave nut with special tool to the
specified torque;
Primary sheave nut tightening torque: 115 N·m
Tool: Rotor Holder
●
Tighten secondary sheave nut with special tool to
the specified torque;
Secondary sheave tightening torque: 115 N·m
Tool: Rotor Holder
CVT Case Cover
●
Install the new gasket and dowel pins.
Note:
Turn the primary fixed sheave until the belt is
seated in and both primary and secondary sheaves
move together smoothly without slip.
Summary of Contents for XY500UTV
Page 1: ......
Page 2: ...Service Manual XY500UTV XY500LUTV XY500UE XY500UEL 4 4 ZHEJIANG XINYANG INDUSTRY CO LTD ...
Page 16: ...1 SERVICE INFORMATION 1 13 Cables Pipes Cable Routing 1 ...
Page 17: ...1 SERVICE INFORMATION 1 14 ...
Page 18: ...1 SERVICE INFORMATION 1 15 Carburetor Condition 1 ...
Page 19: ...1 SERVICE INFORMATION 1 16 Carburetor Condition EFI Condition ...
Page 20: ...1 SERVICE INFORMATION 1 17 Carburetor Condition 1 ...
Page 21: ...1 SERVICE INFORMATION 1 18 ...
Page 41: ...2 VEHICLE BODY MUFFLER 2 20 Description of visible parts ...
Page 44: ......
Page 66: ...4 COOLING AND LUBRICATIING SYSTEM 4 2 Cooling System Illustration 4 ...
Page 114: ...6 ENGINE REMOVAL INSPECTION INSTALLATION 6 29 Primary and Secondary Sheave 6 ...
Page 225: ......