6. ENGINE REMOVAL; INSPECTION & INSTALLATION
6-20
●
Install valve spring with small-pitch end “b” facing
cylinder head. Big-pitch end “a” is marked.
●
Put on the valve spring retainer. Use the valve
spring compressor to press down the spring. Fit the
two cotter halves to the stem end and release
compressor to allow the cotter
①
to wedge in
between seat and stem. Make sure that the rounded
lip
②
of the cotter fits into the groove
③
in the stem
end.
Tool:
Valve Spring Compressor
Tweezers
●
Check the sealing effectiveness of cylinder head.
Dip clean solution into valve IN/EX
①
and check
for any leakage of valve seat
②
after a few
minutes.
NOTE:
Knock the valve end with rubber
hammer. Make sure valve cotter is
fit into groove.
Summary of Contents for XY500UTV
Page 1: ......
Page 2: ...Service Manual XY500UTV XY500LUTV XY500UE XY500UEL 4 4 ZHEJIANG XINYANG INDUSTRY CO LTD ...
Page 16: ...1 SERVICE INFORMATION 1 13 Cables Pipes Cable Routing 1 ...
Page 17: ...1 SERVICE INFORMATION 1 14 ...
Page 18: ...1 SERVICE INFORMATION 1 15 Carburetor Condition 1 ...
Page 19: ...1 SERVICE INFORMATION 1 16 Carburetor Condition EFI Condition ...
Page 20: ...1 SERVICE INFORMATION 1 17 Carburetor Condition 1 ...
Page 21: ...1 SERVICE INFORMATION 1 18 ...
Page 41: ...2 VEHICLE BODY MUFFLER 2 20 Description of visible parts ...
Page 44: ......
Page 66: ...4 COOLING AND LUBRICATIING SYSTEM 4 2 Cooling System Illustration 4 ...
Page 114: ...6 ENGINE REMOVAL INSPECTION INSTALLATION 6 29 Primary and Secondary Sheave 6 ...
Page 225: ......