Step 3
Switch ON the Maintenance Bypass
Breaker as shown below.
Step 4
Switch OFF the Main Breaker (Q1) as
shown below.
ON
OFF
I
0
Q1
Main
Step 5
Now one can change Power Module or
Battery Module.
3.3.3.2 Transfer to UPS Protection
Step 1
Make sure the maintenance is complete. The Power Modules and
battery modules have been installed well.
Step 2
Switch ON the Main Breaker (Q1) as shown below.