RACK 1
RACK 2
Module Address
DIP SWITCH
Module Address
DIP SWITCH
1
21
2
22
3
23
4
24
5
25
6
26
7
27
8
28
9
29
10
30
11
31
12
32
13
33
14
34
15
35
Table 2-1
DIP switch setting and Module Address
Power Module ID Assignment
The Power Module address ID assignment is shown in
Table 2-1
. The DIP switches are mounted
on the Power Module front panel, identified as
in Fig 2-17.
The DIP switch positions are set at factory. It
’s
not necessary to change them for single UPS (RACK
1) system application. But for Parallel UPS system application, please follow the instructions in
C
hapter 9 “
UPS Installation for Parallel Rack System
”
.
Summary of Contents for X90-2S
Page 12: ...2 6 1 Mechanical Data Dimensions Width Depth Height 600mm 1065m 2010mm Figure 2 8 Dimensions...
Page 15: ...Figure 2 13 Terminal Blocks...
Page 17: ...Off There is neither a fault nor an alarm...
Page 22: ......
Page 37: ......
Page 39: ...Step 7 Switch ON the output breaker Q3 AC startup procedure is complete...
Page 42: ......
Page 53: ...Figure 4 6 Control screen page...
Page 55: ...Figure 4 9 System Measurement Screens...
Page 56: ...Figure 4 10 Module Measurement Screens...
Page 88: ......