Step 5
: Make sure that no warning or fault event occurs. If yes, please refer to Chapter 6
Troubleshooting to solve it.
Step 6
: Press
“
Power
”
button for two seconds to turn on the inverter, as shown below.
UPS will do self-test and start up the inverter. UPS will enter Line mode when all power modules
are ready.
Summary of Contents for X90-2S
Page 12: ...2 6 1 Mechanical Data Dimensions Width Depth Height 600mm 1065m 2010mm Figure 2 8 Dimensions...
Page 15: ...Figure 2 13 Terminal Blocks...
Page 17: ...Off There is neither a fault nor an alarm...
Page 22: ......
Page 37: ......
Page 39: ...Step 7 Switch ON the output breaker Q3 AC startup procedure is complete...