Warning! EPO Active
Check the EPO connector
Check if the pre-installed connector
shorting X1.1 & X1.2 is loose or
unplugged.
Warning! Over Load Fail
The load is demanding more power than
the UPS can supply. UPS will transfer
from Line mode to Bypass mode.
Lower the load within UPS capacity
Warning! Communicate CAN
Fail
CAN communication error
Contact service personnel.
Warning! Over Load
In Line mode, the load is demanding
more power than the UPS can supply.
Lower the load within UPS capacity
Warning! Battery Open
Battery not connected
1.
Check battery breaker.
2.
Check if the battery is well
connected.
3.
Check the setting of Nominal Battery
voltage.
4.
Contact service personnel if
necessary
Warning! Battery voltage
High
Battery voltage is too High.
Check the setting of Nominal Battery
voltage and contact service personnel.
Warning! Charge Fail
As stated
Contact service personnel.
Warning! EEPROM Fail
EEPROM operation error
Contact service personnel.
Warning! Fan Lock
As stated
Check if any fan is blocked or contact
service personnel.
Warning! Line Phase Error
As stated
Check if the Mains input phase sequence
is correct and contact service personnel.
Warning! Bypass Phase
Error
As stated
Check if the Bypass input phase
sequence is correct and contact service
personnel.
Warning! N Loss
Neutral loss
Check if the Neutral connection is good
and contact service personnel.
Warning! Redundancy Set
Fail
As stated
Check if the redundancy setting is correct
and contact service personnel.
Warning! Maintenance
Bypass
The UPS has entered maintenance
bypass mode.
Check if the cable is plugged in well and if
the mechanical lock plate on the
Maintenance Bypass Breaker is locked
well. Please refer to Figure 5-3-1.
Summary of Contents for X90-2S
Page 12: ...2 6 1 Mechanical Data Dimensions Width Depth Height 600mm 1065m 2010mm Figure 2 8 Dimensions...
Page 15: ...Figure 2 13 Terminal Blocks...
Page 17: ...Off There is neither a fault nor an alarm...
Page 22: ......
Page 37: ......
Page 39: ...Step 7 Switch ON the output breaker Q3 AC startup procedure is complete...
Page 42: ......
Page 53: ...Figure 4 6 Control screen page...
Page 55: ...Figure 4 9 System Measurement Screens...
Page 56: ...Figure 4 10 Module Measurement Screens...
Page 88: ......