2.12 Power Module Installation
The weight of Power Module is over 30Kg. Therefore, at least two people are
required for handling it.
2.12.1 Insert the Power Module
(1.)
Adjust the DIP switch positions to set the different Module Address ID. Refer to
Table 2-1
.
(2.)
Switch the ready switch on the front panel of the module
to the “
” position.
(3.)
Two people insert the Power Module into an unoccupied slot.
Summary of Contents for X90-2S
Page 12: ...2 6 1 Mechanical Data Dimensions Width Depth Height 600mm 1065m 2010mm Figure 2 8 Dimensions...
Page 15: ...Figure 2 13 Terminal Blocks...
Page 17: ...Off There is neither a fault nor an alarm...
Page 22: ......
Page 37: ......
Page 39: ...Step 7 Switch ON the output breaker Q3 AC startup procedure is complete...
Page 42: ......
Page 53: ...Figure 4 6 Control screen page...
Page 55: ...Figure 4 9 System Measurement Screens...
Page 56: ...Figure 4 10 Module Measurement Screens...
Page 88: ......