Maintenance & Troubleshooting
WorkCentre Pro 412
Launch Issue
7-6
August 2001
• SRAM Test
This test is used for checking the Random Access Memory (RAM) on the main PBA. If all memory is working
normally, the LCD shows TESTING OK!.
When this testing is carried out, any picture data stored in memory is erased.
• ROM Test
This test mode will display and check the current ROM level in your machine.
• DRAM Test
This test checks the DRAM memory status and shows if it is functioning properly
• Pattern Test
1. Select Pattern Test.
2. There are 4 different pattern tests. Scroll to the options by pressing Up or Down repeatedly until you find
the correct selection.
3. Press Select key.
• ADJUST Shading
This procedure is needed to set (make) a new shading reference value. The reference value is preset at fac-
tory. However, when a new CCD or main board is installed, the reference value must be set again.
Follow the next steps as instructed through the LCD window. After the shading value has just been set, the
shading value pattern is automatically printed. The shading value pattern shows the value of the white refer-
ence level of the Contact Image Sensor. Check for the waveform in the pattern. For best results the waveform
should be level. If there are many points sharply broken, perform the adjust shading procedure several times
until the waveform is level.
FLASH VER.: 1.00 V
ENGINE VER: 1.00 V
Summary of Contents for WorkCentre Pro 412
Page 18: ...Introduction WorkCentre Pro 412 August 2001 1 14 Launch Issue This page intentionally blank...
Page 22: ...Precautions WorkCentre Pro 412 Launch Issue 3 2 August 2001 This page intentionally blank...
Page 99: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 17 August 2001 No Image...
Page 100: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 18 August 2001...
Page 101: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 19 August 2001 All Black...
Page 103: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 21 August 2001 Dark Image...
Page 104: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 22 August 2001 Background...
Page 105: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 23 August 2001 Ghost...
Page 106: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 24 August 2001 Black Dot...
Page 107: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 25 August 2001 Horizontal Band...
Page 108: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 26 August 2001 Irregular Density...
Page 109: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 27 August 2001 White Spot...
Page 111: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 29 August 2001 Poor Fusing...
Page 115: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 33 August 2001 Fuser Error...
Page 117: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 35 August 2001 Paper Jam Jam 1...
Page 118: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 36 August 2001 Engine Error...
Page 163: ...Block Diagram WorkCentre Pro 412 Launch Issue 10 1 August 2001 10 Block Diagram...
Page 164: ...Block Daigram WorkCentre Pro 412 Launch Issue 10 2 August 2001 This page intentionally blank...
Page 165: ...Connection Diagram WorkCentre Pro 412 Launch Issue 11 1 August 2001 11 Connection Diagram...
Page 181: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 15 August 2001 12 15 LIU Circuit Diagram...
Page 182: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 16 August 2001 12 16 OPE Circuit Diagram...
Page 187: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 21 August 2001 12 21 ADF Circuit Diagram...
Page 189: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 23 August 2001 12 23 PTL Circuit Diagram...