Circuit Description
WorkCentre Pro 412
Launch Issue
5-35
August 2001
5-7 LIU PBA
5-7-1. SUMMARY
LIU WIRE CONNECTS Main B’D’s MODEM AND LINE PARTS, AND IMPEDANCE MATCHING (AC, DC),
RING DETECTION PART and LINE SEIZURE (DIALER).
5-7-2. DC MATCHING PART
Normal movement range of LIU is 12mA to 9mA.
Adapting CTR21 standard, the regulation limits to 60mA CURRENT flow through the terminal.
Therefore, select (*:for EU PIT) Option to connect necessary items then the current through LIU will not
exceed 60mA.
• CTR21 Standard (Europe): 12mA~60mA • OTHER Standard (U.S.): 12mA to 90mA
DC has a character to pass through the LINE. And with Q1 (VN2410) GATE section’s LINE INPUT current and
Q1 Source connection to R20, can be decided as follows:
• -VDCR = VL1 + ILINE X R20.
(VDCR: Tip-Ring CD Voltage, ILINE:
Current flow)VL1:Line Input Voltage, VL1 = VBD1+VCE(Q2)+VDS(Q1).
5-7-3. AC MATCHING PART
Basic LIU’s AC IMPEDANCE is 600 and uses R47. 48. C36 to possibly control combined IMPEDANCE.
• U.S. Usage: A terminal IMPEDANCE Æ 600W(±30%).
• CTR21: A Terminal IMPEDANCE Æ 270+750W//150nF.
5-7-4. DIALER PART
*MF DIAL
DTMF Dialing is controlled by MODEM and should be selected by appropriate LEVEL and On-off Time output
based on each countries’ own National specification.
• Frequency Tolerance: ±1.5%.
High Group: 1209, 1336, 1477, 1633Hz.
Low Group: 697, 770, 852, 941 Hz.
*DP DIAL
Controls from MAIN through / DP-Terminal.
for U.S.Usage, set time to DF signal of 40:60 M/B. DP signal is made of U6 (pcb817). The DC current which
flows through Q2 Base is regulated by On/Off switch and turns to DP dial signal with a COUPLER.
• CTR 21 does not have telephone capability but has the number 3 and 4 Line Connection. No DP condition
but possibility to get approval only on DTMF Dial based terminal.
5-7-5. RING DETECTION PART
RING SIGNALS from the LINE section (TIP, RING) are further passed through C5, R3, ZD1, and ZD2 and
ends up at U9, (PC 814). U9 then detects above RING SIGNAL and passes the output to MAIN B’D. The wire
diagram’s C5 is RINGER CAPACITOR and it normally uses 1UF/250V.
U.S. Usage
CTR21
High Frequency Level
-9.0+2.0/-2.5
-7.0 +1.0/-2.0
Low Frequency Level
-9.0+1.0/-2.0
-11.0+2.5/-2.0
Summary of Contents for WorkCentre Pro 412
Page 18: ...Introduction WorkCentre Pro 412 August 2001 1 14 Launch Issue This page intentionally blank...
Page 22: ...Precautions WorkCentre Pro 412 Launch Issue 3 2 August 2001 This page intentionally blank...
Page 99: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 17 August 2001 No Image...
Page 100: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 18 August 2001...
Page 101: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 19 August 2001 All Black...
Page 103: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 21 August 2001 Dark Image...
Page 104: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 22 August 2001 Background...
Page 105: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 23 August 2001 Ghost...
Page 106: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 24 August 2001 Black Dot...
Page 107: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 25 August 2001 Horizontal Band...
Page 108: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 26 August 2001 Irregular Density...
Page 109: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 27 August 2001 White Spot...
Page 111: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 29 August 2001 Poor Fusing...
Page 115: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 33 August 2001 Fuser Error...
Page 117: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 35 August 2001 Paper Jam Jam 1...
Page 118: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 36 August 2001 Engine Error...
Page 163: ...Block Diagram WorkCentre Pro 412 Launch Issue 10 1 August 2001 10 Block Diagram...
Page 164: ...Block Daigram WorkCentre Pro 412 Launch Issue 10 2 August 2001 This page intentionally blank...
Page 165: ...Connection Diagram WorkCentre Pro 412 Launch Issue 11 1 August 2001 11 Connection Diagram...
Page 181: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 15 August 2001 12 15 LIU Circuit Diagram...
Page 182: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 16 August 2001 12 16 OPE Circuit Diagram...
Page 187: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 21 August 2001 12 21 ADF Circuit Diagram...
Page 189: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 23 August 2001 12 23 PTL Circuit Diagram...