Maintenance & Troubleshooting
WorkCentre Pro 412
Launch Issue
7-5
August 2001
7-2-2 Test Mode
The test mode is used to test certain functions of the machine. The available tests are:
•User mode: Clean drum, Notify toner low
•tech mode: switch test, modem test, SRAM test, DRAM test, ROM test, Pattern test, Clear count, Answer On
CNG, Adjust shading, Flash upgrade.
To enter the Tech Mode:
1.
Enter the Tech mode by pressing Menu, #, 1, 9, 3, 4. The letter “T” will appear in the top right of the dis-
play.
2.
In Tech mode, press Menu, ‘Maintenance [System]’ is displayed on the LCD.
3.
Press the Select key
4.
Scroll to the options by pressing Up and Down navigation key repeatedly until the correct selection is
found.
5.
Press the Select key to initiate the tech mode.
6.
Perform step 1 to return to user mode.
• Cleaning DRUM
This procedure removes excess toner on the OPC drum.
1. Make sure that paper is loaded in the automatic feeder or document glass (platen).
2.
Press Menu, -> Up or Down key -> Maintenance -> Select -> Up or Down key ->Clean Drum
3.
Press ‘Select’.The machine automatically feeds a sheet of paper, and prints out. The excess toner on the
OPC drum surface is fused to the paper.
• Notify Toner Low
With this feature enabled, when the toner becomes low, the toner low information will be sent to the specified
contact point, for example, the service company. After you access this menu, select on, and when the LCD
prompts, enter the name and the number of the contact point, the customer’s FAX number, the model name,
and the serial number.
• Switch Test
This test checks the operation of the LCD display and the LED indicators that interface the switches on the
operation panel.
• Modem Test
This test causes the machine to generate a particular frequency to verify the operation of the modem and it’s
control circuits.
Summary of Contents for WorkCentre Pro 412
Page 18: ...Introduction WorkCentre Pro 412 August 2001 1 14 Launch Issue This page intentionally blank...
Page 22: ...Precautions WorkCentre Pro 412 Launch Issue 3 2 August 2001 This page intentionally blank...
Page 99: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 17 August 2001 No Image...
Page 100: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 18 August 2001...
Page 101: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 19 August 2001 All Black...
Page 103: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 21 August 2001 Dark Image...
Page 104: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 22 August 2001 Background...
Page 105: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 23 August 2001 Ghost...
Page 106: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 24 August 2001 Black Dot...
Page 107: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 25 August 2001 Horizontal Band...
Page 108: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 26 August 2001 Irregular Density...
Page 109: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 27 August 2001 White Spot...
Page 111: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 29 August 2001 Poor Fusing...
Page 115: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 33 August 2001 Fuser Error...
Page 117: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 35 August 2001 Paper Jam Jam 1...
Page 118: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 36 August 2001 Engine Error...
Page 163: ...Block Diagram WorkCentre Pro 412 Launch Issue 10 1 August 2001 10 Block Diagram...
Page 164: ...Block Daigram WorkCentre Pro 412 Launch Issue 10 2 August 2001 This page intentionally blank...
Page 165: ...Connection Diagram WorkCentre Pro 412 Launch Issue 11 1 August 2001 11 Connection Diagram...
Page 181: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 15 August 2001 12 15 LIU Circuit Diagram...
Page 182: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 16 August 2001 12 16 OPE Circuit Diagram...
Page 187: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 21 August 2001 12 21 ADF Circuit Diagram...
Page 189: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 23 August 2001 12 23 PTL Circuit Diagram...