Circuit Description
WorkCentre Pro 412
Launch Issue
5-18
August 2001
5-3 Scanner
5-3-1 Summary
This flat-bed type device to read manuscripts has 600dpi CCD as an image sensor. There is one optical sen-
sor for detecting CCD home position and Scan-end position. The home position is detected by a optical sen-
sor which is attached to the CCD Module. The Scan-end position is calculated by the number of motor steps.
CCD
Contact Image Sensor improves productivity and allows a compact design.
This machine uses a color CCD.
• Minimum scan line time for one color: 5mS.
• Light source power: +12V.
• Maximum pixel frequency: 6 MHz.
• Effective sensor element: 5340 X 3.
• Clamp level: 0.7 to 0.8V.
• Bright output: min. 0.8V.
IRQ
[ AFE]
12-bit
A/ D converter
Shadi ng
C orrectio n
Enlarge men t
/ Redu ction
SRAM
8 192 x 8
( 2l ine)
Imag e
Processing
M o dule
D M A
Interface
CIP3
Register
CPU I/F
Mod ule
Vp eak
Contro l
M o to r
Con tro l
AIN
AD C_REFT
ADC _REFB
PI_TG
PI1
R_LED,
G _LE D,
B _LE D
Gam ma
C orrectio n
SRAM_A[ 15:0]
SRAM_D[ 15: 0]
SRAM_nRD
SRAM_nWR
A [ 5: 0]
D [ 15: 0]
nCS
nRD
nWR
nXDREQ
nXDACK
TX_A, B
nTX_A, B
TX_EN1, EN2
Sen so r
Interface
Shadi ng
Acqu isitio n
SRAM
1 024 x 8
( R/G/ B)
SRAM
4096 x16
(2 line )
SRAM
256 x 8
PI2
EXT SRAM
Interrupt
Contro l
Vertical
D ecim ation
SRAM
1 024 x 8
DUOIP2 Block Diagram
Summary of Contents for WorkCentre Pro 412
Page 18: ...Introduction WorkCentre Pro 412 August 2001 1 14 Launch Issue This page intentionally blank...
Page 22: ...Precautions WorkCentre Pro 412 Launch Issue 3 2 August 2001 This page intentionally blank...
Page 99: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 17 August 2001 No Image...
Page 100: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 18 August 2001...
Page 101: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 19 August 2001 All Black...
Page 103: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 21 August 2001 Dark Image...
Page 104: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 22 August 2001 Background...
Page 105: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 23 August 2001 Ghost...
Page 106: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 24 August 2001 Black Dot...
Page 107: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 25 August 2001 Horizontal Band...
Page 108: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 26 August 2001 Irregular Density...
Page 109: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 27 August 2001 White Spot...
Page 111: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 29 August 2001 Poor Fusing...
Page 115: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 33 August 2001 Fuser Error...
Page 117: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 35 August 2001 Paper Jam Jam 1...
Page 118: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 36 August 2001 Engine Error...
Page 163: ...Block Diagram WorkCentre Pro 412 Launch Issue 10 1 August 2001 10 Block Diagram...
Page 164: ...Block Daigram WorkCentre Pro 412 Launch Issue 10 2 August 2001 This page intentionally blank...
Page 165: ...Connection Diagram WorkCentre Pro 412 Launch Issue 11 1 August 2001 11 Connection Diagram...
Page 181: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 15 August 2001 12 15 LIU Circuit Diagram...
Page 182: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 16 August 2001 12 16 OPE Circuit Diagram...
Page 187: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 21 August 2001 12 21 ADF Circuit Diagram...
Page 189: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 23 August 2001 12 23 PTL Circuit Diagram...