Circuit Description
WorkCentre Pro 412
Launch Issue
5-22
August 2001
5-4 Host Interface
Referred to IEEE 1284 standard.
5-4-1. Host Interface
PARALLEL PORT INTERFACE PART KS32C61200 enables the parallel interface with the PC. This part is
connected to the PC through a Centronics connector. It generates major control signals that are used to actu-
ate parallel communication. It is comprised of/ERROR, PE, BUSY, /ACK, SLCT, /INIT, /SLCTIN, /AUTOFD
and /STB. This part and the PC data transmission method support the method specified in IEEE P1283
Parallel Port Standard (http://www.fapo.com/ieee1284.html). In other words, it supports both compatibility
mode (basic print data transmitting method), the nibble mode (4bit data; supports data uploading to PC) and
ECP (enhanced capabilities port: 8bits data - high speed two-way data transmission with PC). Compatibility
mode is generally referred to as the Centronics mode and this is the protocol used by most PCs to transmit
data to the printer. ECP mode is an improved protocol for the communication between PC and peripherals
such as printer and scanner, and it provides high speed two-way data communication. ECP mode provides
two cycles in the two-way data transmission; data cycle and command cycle. The command cycle has two for-
mats; Run-Length Count and Channel Addressing. RLE (Run-Length Count) has high compression rate (64x)
and it allows real-time data compression that it is useful for the printer and scanner that need to transmit large
raster images . Channel Addressing was designed to address multiple devices with single structure. For
example, like this system, when the fax/printer/scanner have one structure, the parallel port can be used for
other purposes while the printer image is being processed.This system uses RLE for high speed data trans-
mission. PC control signals and data send/receive tasks such as PC data printing, high speed uploading of
scanned data to PC, upload/download of the fax data to send or receive and monitoring the system control
signal and overall system from PC are all processed through this part.
Compatibility Hardware Handshaking Timing
Summary of Contents for WorkCentre Pro 412
Page 18: ...Introduction WorkCentre Pro 412 August 2001 1 14 Launch Issue This page intentionally blank...
Page 22: ...Precautions WorkCentre Pro 412 Launch Issue 3 2 August 2001 This page intentionally blank...
Page 99: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 17 August 2001 No Image...
Page 100: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 18 August 2001...
Page 101: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 19 August 2001 All Black...
Page 103: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 21 August 2001 Dark Image...
Page 104: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 22 August 2001 Background...
Page 105: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 23 August 2001 Ghost...
Page 106: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 24 August 2001 Black Dot...
Page 107: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 25 August 2001 Horizontal Band...
Page 108: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 26 August 2001 Irregular Density...
Page 109: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 27 August 2001 White Spot...
Page 111: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 29 August 2001 Poor Fusing...
Page 115: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 33 August 2001 Fuser Error...
Page 117: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 35 August 2001 Paper Jam Jam 1...
Page 118: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 36 August 2001 Engine Error...
Page 163: ...Block Diagram WorkCentre Pro 412 Launch Issue 10 1 August 2001 10 Block Diagram...
Page 164: ...Block Daigram WorkCentre Pro 412 Launch Issue 10 2 August 2001 This page intentionally blank...
Page 165: ...Connection Diagram WorkCentre Pro 412 Launch Issue 11 1 August 2001 11 Connection Diagram...
Page 181: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 15 August 2001 12 15 LIU Circuit Diagram...
Page 182: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 16 August 2001 12 16 OPE Circuit Diagram...
Page 187: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 21 August 2001 12 21 ADF Circuit Diagram...
Page 189: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 23 August 2001 12 23 PTL Circuit Diagram...