Sheet Enhancement Module Specifications
• Height: 41.5 "
• Width: 14.25 "
• Depth: 28.25 "
• Weight: 168 lbs.
Sheet Retime Module (SRM)
The Sheet Retime Module (SRM) is a paper path timing module required to be installed only on 157 or
314 systems with a single Basic Finishing Module (a BFM, BFM Plus or a Direct Connect BFM).
The SRM is located before the BFM in the configuration. It enables BFM stapling capabilities and increases
the speed of the sheets as they enter the BFM. It provides the needed gap between prints for the BFM
to process sets at 157 or 314 ppm and staple sets at this full speed.
Note
Only A4/8.5 x 11 inch paper will run at the full 157 ppm or 314 ppm speed. Tab jobs and stock sizes less
than 8.2 inches (208mm) will run at reduced productivity.
Note
Small stock sizes less than 6.9 inches (175mm), such as A5 paper, cannot be run through the SRM.
Note
When running tab stock mixed with 8.5 x 11 in/A4 body stock enable the Improve Initial Pages
Registration within Set feature from Print Manager/Stacking area.
Xerox
®
Nuvera
®
6-12
User Guide and Training Aid (UGTA)
Xerox Nuvera EA/MX Production System
Summary of Contents for Nuvera
Page 2: ......
Page 20: ...Xerox Nuvera 1 2 User Guide and Training Aid UGTA Copyright and Trademark Declarations ...
Page 42: ...Xerox Nuvera 4 4 User Guide and Training Aid UGTA About ...
Page 66: ...Xerox Nuvera 7 8 User Guide and Training Aid UGTA Managing System Resources ...
Page 68: ...Xerox Nuvera 8 2 User Guide and Training Aid UGTA Managing System Software and Hardware ...
Page 82: ...Xerox Nuvera 10 12 User Guide and Training Aid UGTA Expected Paper Handling ...
Page 120: ...Xerox Nuvera 12 26 User Guide and Training Aid UGTA Setting Up Complex Jobs ...
Page 124: ...Xerox Nuvera 13 4 User Guide and Training Aid UGTA When to unload Stackers ...
Page 254: ...Xerox Nuvera 19 6 User Guide and Training Aid UGTA Clearing Paper Jams ...
Page 293: ......
Page 294: ......