975-0289-01-01
xv
Power Down Procedure for Softwired Installations - - - - - - - - - - - - - - - - - - xi
Power Down Procedure for Hardwired Installations - - - - - - - - - - - - - - - - -xii
The PowerHub 1800 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1–1
PowerHub 1800 Components - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1–2
PowerHub 1800 Features - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1–3
Softwired Utility or Generator Applications- - - - - - - - - - - - - - - - - - - - - 1–5
Hardwired Utility Applications - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1–6
Hardwired Solar Applications - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1–7
Hardwired Wind Applications - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1–8
Hardwired Combination Applications- - - - - - - - - - - - - - - - - - - - - - - - - 1–9
Dimensions (not to scale) - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 2–4
Battery Box and Battery Size - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 2–5
Preparing the Components for Assembly- - - - - - - - - - - - - - - - - - - - - - - 3–2
Connecting the Battery Box to the Inverter - - - - - - - - - - - - - - - - - - - - - 3–3
Preparing the Battery Bank - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3–4
Battery Cabling for Two Batteries - - - - - - - - - - - - - - - - - - - - - - - - - - - 3–5
Connecting the Battery Bank to the Inverter - - - - - - - - - - - - - - - - - - - - 3–6
Connecting Two Battery Boxes to the Inverter - - - - - - - - - - - - - - - - - - - 3–7
Replacing the Top to the Battery Box - - - - - - - - - - - - - - - - - - - - - - - - - 3–8
Plug-n-Go Wiring (Softwired)- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3–9
Terminal Access for Hardwiring - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3–11
Figure 3-10 Removing the AC Cord - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3–12
Figure 3-11 Preparing the Knockouts - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3–13
Figure 3-12 Connecting the AC Input and Output from a Generator - - - - - - - - - - - - - 3–14
Figure 3-13 Connecting the AC Input and Output from the Utility - - - - - - - - - - - - - - 3–15
Figure 3-14 Connecting the DC Input (Renewable Energy Solar Panel) - - - - - - - - - - 3–16
Figure 3-15 Connecting the DC Input (Renewable Energy Solar Array) - - - - - - - - - - 3–17
Figure 3-16 Connecting the DC Input (Renewable Energy Wind) - - - - - - - - - - - - - - 3–18
Figure 3-17 Replacing the Top Cover on the Inverter- - - - - - - - - - - - - - - - - - - - - - - 3–19
Figure 3-18 Power Up Procedure for Softwired Installations - - - - - - - - - - - - - - - - - - 3–20
Figure 3-19 Power Up Procedure for Hardwired Installations - - - - - - - - - - - - - - - - - 3–21
Figures
975-0289-01-01(PowerHub_1800_IG).book Page xv Thursday, June 4, 2015 9:49 AM
Summary of Contents for PH1800-GFP
Page 2: ...975 0289 01 01 PowerHub_1800_IG book Page 2 Thursday June 4 2015 9 49 AM ...
Page 20: ...ii 975 0289 01 01 PowerHub_1800_IG book Page ii Thursday June 4 2015 9 49 AM ...
Page 30: ...1 10 975 0289 01 01 PowerHub_1800_IG book Page 10 Thursday June 4 2015 9 49 AM ...
Page 66: ...3 26 975 0289 01 01 PowerHub_1800_IG book Page 26 Thursday June 4 2015 9 49 AM ...
Page 74: ...2 975 0289 01 01 PowerHub_1800_IG book Page 2 Thursday June 4 2015 9 49 AM ...
Page 75: ...975 0289 01 01 PowerHub_1800_IG book Page 3 Thursday June 4 2015 9 49 AM ...