U
SER
M
ANUAL
X
ORAYA
Z7
|
X
ORAYA
ML-Z7
X
ORAYA
S
UITE
102
Signal configuration:
Click
Open selection file
(5)
and select a suitable XML, CFG or LAB file.
or
Click
Signal selection
and select the signals manually. (
➔
The X
ORAYA
Suite calculates the expected percentage of the bus load
increase.
The result evaluation is displayed via the
Traffic light for the bus
load
(7)
.
If angle-synchronous (RPM-dependent) event channels are used, select
the
Engine RPM
(8
), which influences the bus load calculation.
Configure the levels of the
Traffic light for the bus load
(7)
:
Right-click on the traffic light and then on
Edit traffic light settings for
this interface type
.
Specify the percentage limit between green and yellow (standard: 50).
Specify the percentage limit between yellow and red (standard: 80).
Click
OK
.
Summary of Contents for XORAYA ML-Z7
Page 1: ...User Manual XORAYA Z7 XORAYA ML Z7 Edition 1 2 1 December 2022...
Page 72: ...USER MANUAL XORAYA Z7 XORAYA ML Z7 XORAYASUITE 72 RS 232...
Page 205: ......
Page 206: ......
Page 207: ......