Commissioning
4.1
Unpacking
Upon unpacking, check whether the delivery is complete and all components
appear in perfect condition. (
➔
Please contact X2E GmbH immediately should the delivery be
incomplete or upon damaged components.
Do not put any defective component into operation.
X2E GmbH can only accept your complaint and replace the affected
component upon prompt notification.
Keep original packaging
Keep the original packaging and packing materials for
later storage or further transport.
4.2
Selecting an installation location
The datalogger installation location must meet the following criteria:
▪
Location of the DC power supply (12 V)
▪
Distance of at least 2 cm to other devices
▪
Solid and stable base
▪
Adequate airflow
▪
Datalogger front and back sides must not be covered
4.3
Installing the datalogger
X2E GmbH provides no special requirements for datalogger installation.
Install the datalogger in the vehicle so as to avoid a damage risk at any time.
Summary of Contents for XORAYA ML-Z7
Page 1: ...User Manual XORAYA Z7 XORAYA ML Z7 Edition 1 2 1 December 2022...
Page 72: ...USER MANUAL XORAYA Z7 XORAYA ML Z7 XORAYASUITE 72 RS 232...
Page 205: ......
Page 206: ......
Page 207: ......