Installation
System 182-XT-4
3 - 14
ba75753e06
12/2014
3.5.3
Variant 2: stack expansion backwards
Preparing the stack
mounting
Fig. 3-7
Preparing the MIQ modules for stack mounting (variant 2)
Mounting the contact
base
Fig. 3-8
Mounting the contact base (variant 2)
1
Remove the covers from the drilled mounting holes (pos. 1 and
3 in Fig. 3-7).
2
Remove the contact cover (pos. 2).
3
Pull off the adhesive label (pos. 4).
4
On the MIQ module, remove the two countersunk screws (pos.
5) and swing open the module lid.
5
1
2
Bei
Stapelmontage
Aufkleber
entfernen
und
Kontaktträger
montieren
For
stack
mounting
remove
label
and
install
contact
carrier
3
4
MIQ module
DIQ/S 182 XT-4
6
7
DIQ/S 182 XT-4
Summary of Contents for DIQ/S 182-XT-4
Page 6: ...Contents System 182 XT 4 0 4 ba75753e06 12 2014 ...
Page 14: ...Safety System 182 XT 4 2 4 ba75753e06 12 2014 ...
Page 68: ...Installation System 182 XT 4 3 54 ba75753e06 12 2014 ...
Page 86: ...Operation System 182 XT 4 4 18 ba75753e06 12 2014 ...
Page 92: ...The SETTINGS menu System 182 XT 4 5 6 ba75753e06 12 2014 ...
Page 128: ...Maintenance and cleaning System 182 XT 4 7 2 ba75753e06 12 2014 ...
Page 144: ...Technical data System 182 XT 4 9 12 ba75753e06 12 2014 ...
Page 146: ...Accessories and options System 182 XT 4 10 2 ba75753e06 12 2014 ...
Page 150: ...Appendix store separately if required System 182 XT 4 12 2 ba75753e06 12 2014 ...
Page 151: ......