Hardware Troubleshooting
MedWeld 5000 Technical Reference Manual
9 - 9
M-032170
No line voltage
reading or no
zero-crossing
Main breaker switch is OFF.
Turn ON the breaker.
No 480/600 VAC is connected to the
top of the breaker.
Verify that supply voltage (480 or 600
VAC) is connected to the top of the
breaker. (On a single-pack control, supply
voltage is connected at L1 and L2.)
Faulty circuit breaker.
Supply voltage IS connected to the
breaker. Verify that power is available on
the load side of the circuit breaker.
Faulty cable between timer and
inverter.
Replace cable.
If “No Zero Crossing Sync” occurs
during a weld, there may be a loose
connection or weak welding bus.
(On the 1,200-A. inverter, the zero-
crossing signal comes through the
gate board on the SCR pack.)
Tighten loose connections. Install weld
bus capacitors. Re-distribute loads on the
weld bus. Install a stiffer power supply.
Problem
Possible Cause
Possible Solution
Summary of Contents for MedWeld 5000
Page 2: ...MedWeld 5000 Technical Reference Manual Modified 1 31 06 M 032170...
Page 6: ...MedWeld 5000 Technical Reference Manual Modified 1 31 06...
Page 38: ...Installing the MedWeld 5000 2 12 MedWeld 5000 Technical Reference Manual M 032170...
Page 82: ...Advanced Software Features 5 12 MedWeld 5000 Technical Reference Manual M 032170...
Page 120: ...Hardware Troubleshooting 9 10 MedWeld 5000 Technical Reference Manual M 032170...