- 15 -
Operation Flowchart
Infusion operational processes
Power On
Connect the power wire, then the light indicator
lights up, the AC power is connected, long
press the power button
for 3 seconds to start up.
Machine launches self-check after starting up, the contents of self-check include: whether the
batteries is normal, whether the system is normal, whether the pressure sensor is normal, etc., after
self-check completed, machine would enter infusion standby interface, waiting for user to input
infusion parameters.
Notes
:
Not connect the AC power supply or the AC power is interrupted, machine would switch to battery
power supply automatically, infusion pump would prompt AC falls off; working on the condition of
battery power supply, pay attention to the risks of battery power off, so please connect the AC power
supply as soon as possible.
Pump installation
Power on
IV Set installation
Parameters setting
Purge bubbles
Venous puncture
Start infusion