Kunststoffschweißtechnik
Foundation: 2207, 2208 DIN 16932 German association for welding
Use for:
ASM 160 / ASM 315 / ASM 355
OD 50 - 315
PE 80
The value for heating element temperature is between 200° C - 220° C.
The
smaller
the pipe wall the
higher
the temperature.
PE 100
The standard value for heating element temperature is 220° C.
Increase the change-over time and the welding pressure time at PE 100 as fast as possible !
1 kp = 10 N
time to
change- reach full
over welding
cool-down
time
0,15 (PE)
time
pressure
pressure in
T
desired
temperature
time
The values apply for the butt welding of pipes according to DVS 2207, 2208 DIN 16932
They are guide values for saddle welding; they may deviate and must be redetermined
if necessary!
pipe
pipe
SDR
bead-up
circular
heat-up
max.
time
welding
cool-
diameter wall
force
bead
time
change-
to reach
force
down
OD
(s)
[kp]
min.
[s]
over
welding
[kp]
time
[mm]
[mm]
[daN]
[mm]
time
pressure [daN]
[min]
[s]
[s]
Table for PE
welding area
in welding area
Additional to the given bead-up force and to the welding force the moving force of the support must be added !
P (N/mm²)
bead-up
heat-up
75
1,9
41
7
0,5
20
4
4
7
2
75
2,3
33
8
0,5
23
4
4
8
2
75
2,9
26
10
0,5
29
4
4
10
3
75
3,6
21
13
0,5
36
5
5
13
5
75
4,3
17,6
15
0,5
43
5
5
15
6
4,5
13,6
15
1,0
45
5
5
15
6
75
5,6
13,6
19
1,0
56
5
5
19
8
75
6,8
11
22
1,0
68
6
6
22
10
75
8,4
9
27
1,5
84
7
7
27
12
75
10,3
7,4
32
1,5
103
7
7
32
14
90
2,2
41
10
0,5
22
4
4
10
2
90
2,8
33
12
0,5
28
4
4
12
3
90
3,5
26
15
0,5
35
5
5
15
4
90
4,3
21
18
0,5
43
5
5
18
6
90
5,1
17,6
21
1,0
51
5
5
21
7
90
5,4
17
22
1,0
54
5
5
22
7
90
6,7
13,6
27
1,0
67
6
6
27
10
90
8,2
11
32
1,5
82
6
6
32
11
90
10,1
9
39
1,5
101
7
7
39
14
90
12,3
7,4
46
2,0
123
8
8
46
16
25.03.2014
Working instructions WIDOS ASM 160 / ASM 315 / ASM 355
Page 26 / 3 of 45