www.whisperkool.com | Page 15
Platinum Split
PREPARING THE FULLY DUCTED EVAPORATOR UNIT (FAN COIL UNIT)
1.
Remove the knockouts for the drain line,
line set, and electrical on the bottom
or rear of the unit (depending on your
installation location).
2.
Remove the insulation from the knockout
holes.
3.
Route the bottle probe from the cellar to
the Evaporator Unit. Follow the directions
on page 33 for correct installation and
location of the bottle probe.
4.
Follow the directions on page 17 to
mount the remote keypad and run the
communication cable to the Evaporator
Unit.
Rubber
Washer
Nut
Unit Panel
Circular Connector/
Bottle Probe Input
Power
3/8” Suction
1/4” Liquid
Drain
Circular Connection Mounting Location