2-8
Prepare Cabinet Opening—New
Utilities
Prepare and route the electrical supply
What type of electrical
connection will you use?
Power Supply Cord:
Follow Option A instructions
Direct Wire:
Follow Option B instructions
Option A, Power Supply Cord:
NOTE:
A grounded 3 prong outlet is required
inside a cabinet next to the dishwasher cabinet
opening.
1-1/2”
(3.8 cm)
Power Supply Cord–Drill hole
1
Preferred location
Preferred location
Optional location
Optional location
Drill a 1-1/2” (3.8 cm) hole in cabinet side or rear.
See product and cabinet opening dimensions.
Wood
cabinet
Metal
cabinet
Power Supply Cord–Prepare hole
2
Wood cabinet: Sand hole until smooth.
Metal cabinet: Cover hole with grommet included
with power supply cord kit.
Option B, Direct Wire:
Helpful Tip:
Wiring the dishwasher will be easier
if you route the cable into the cabinet opening
from the right side.
3/4”
(1.9 cm)
Direct Wire–Drill hole
1
Preferred location
Preferred location
Optional location
Drill a 3/4” (1.9 cm) hole in right-hand cabinet
side or rear. See product and cabinet opening
dimensions.
Summary of Contents for Gold GU2800XTV
Page 4: ... iv NOTES ...
Page 55: ...4 15 NOTES ...
Page 68: ...6 11 SERVICE DIAGNOSTIC CYCLE CHART ...
Page 69: ...6 12 NOTES ...
Page 73: ...7 4 ...
Page 75: ...CORPORATION ...